Install the high-pressure line between the high-pressure rail and the high-pressure pump
- Thread in and install the high pressure line (3) .
- Tighten union nut (1) hand tight.
- Tighten union nut (1) .
TIGHTENING TORQUE SPECIFICATIONS
| High pressure line between the rail and the high pressure pump | |
| M14x1, 5 | tightening torque 33 Nm |
- Tighten down screw (2) .
TIGHTENING TORQUE SPECIFICATIONS
| Fuel line to cylinder head cover | |
| 6x18 | tightening torque 7 Nm |
- Check fuel system for leak tightness.
Follow-up work:
- Refer to INSTALLING THE IGNITION COILS
- Refer to INSTALLING ACOUSTIC COVER AT REAR
- Refer to INSTALLING TENSION STRUT ON SUSPENSION STRUT TOWER .
- Refer to INSTALLING SOUND INSULATION AT THE CENTER OF THE BULKHEAD UPPER PART
- Refer to INSTALLING ACOUSTIC COVER
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT ON THE LEFT
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT ON THE RIGHT
- Refer to CONNECTING BATTERY EARTH LEAD
- Install right luggage compartment trim panel. Refer to INSTALLING RIGHT LUGGAGE COMPARTMENT WHEEL ARCH PANEL (4' SERIES COUPE/CONVERTIBLE) or INSTALLING RIGHT LUGGAGE COMPARTMENT WHEEL ARCH PANEL (4' SERIES GRAN COUPE SEDAN) .