Installing sound insulation at the center of the bulkhead upper part
- Check the seal on the bottom of the sound insulation (2) for damage, replace if necessary.
- Position the sound insulation (2).
- Tighten the screws (1).TIGHTENING TORQUE SPECIFICATIONS
Sound insulation on bulkhead upper part Screw
tightening torque8.0 Nm - Clip in the sealing (2) in the direction of arrow.
- Fasten expanding rivet (1).
- Secure positive battery cable at the sealing (2).