Installing all gates
- Have the special tool 2 359 089
ready.
- Clean contact surfaces (1)
and (2)
off oil, grease and dirt.
- Fit the gate (2) and hand-tighten the screw (1) .
- Make sure the intermediate lever (3)
is in the correct installation position.
- Position the special tool 2 359 089 on the cylinder head.
- Pre-tension the gate with the lever (3) .
- Bring the screw (1) onto the contact surface in the area (2) .
- Make sure that the special tool 2 359 089
does not rotate during this process.
- Attach the gate with the lever (1)
in arrow direction.
- Make sure that the special tool 2 359 089
rests flat against the cylinder head (see arrows in illustration).
- Press the special tool 2 359 089
in arrow direction onto the cylinder head. Simultaneously tighten the screw (1)
.TIGHTENING TORQUE SPECIFICATIONS
Gate to bearing bracket M7 tightening torque 20 Nm - Check the conventional gauge (1)
in the area (A)
for the correct gap dimension.TECHNICAL DATA SPECIFICATION
Gap dimension between gate and bearing bracket Gap dimension A 0.03 mm - Make sure that the gate (1)
lies correctly on the bearing bracket (2)
.
The gate (1) is installed correctly in the marked area.
- Make sure that the gate (1)
lies correctly on the bearing bracket (2)
.
The gate (1) is not installed correctly in the marked area.
- Repeat the process for all gates.