LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2017 >> 340i Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 263 (Cooling System - Repair (F30, 4-CYL RWD)) >> 17 11 Radiator And Cooling Fan >> 17 11 000 Removing and installing the radiator for the high-temperature cooling system (B48)

17 11 000 Removing and installing the radiator for the high-temperature cooling system (B48)

WARNING: This page is about a different car, the 2018 BMW 330i and 2017 BMW 330i. However, it is still accessible from the selected car via links, so may be relevant.
WARNING: Risk of scalding!
Only carry out repair work on the cooling system when the engine has cooled down.

Recycling 

Catch and dispose of escaping coolant in a suitable collecting vessel.

Observe country-specific waste disposal regulations.

IMPORTANT: Wear safety goggles and protective gloves.

Follow the instructions: 

Observe the NOTES  on repair work on the cooling system.

Necessary preliminary tasks: 

Removal: 

Loosen the cable (1) along the arrows.

Unfasten screws (2).

Feed out cover (3) and remove.

G12702377Courtesy of BMW OF NORTH AMERICA, INC.

Unlock coolant line (1) and release.

Unlock coolant line (2) and release.

G12702378Courtesy of BMW OF NORTH AMERICA, INC.

Unlock coolant line (1) and release.

G12702379Courtesy of BMW OF NORTH AMERICA, INC.

Feed out radiator (1) and remove.

G12702380Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Feed in radiator (1) and install.

G12702380Courtesy of BMW OF NORTH AMERICA, INC.

Connect coolant line (1) and lock.

Coolant line (1) must audibly engage.

G12702379Courtesy of BMW OF NORTH AMERICA, INC.

Connect coolant line (2) and lock.

Connect coolant line (1) and lock.

All coolant lines must audibly engage.

G12702378Courtesy of BMW OF NORTH AMERICA, INC.

Feed in and install the cover (3).

Tighten down screws (2).

Tightening torque, refer to: 17 10 2AZ .

Secure the cable (1) along the arrows.

G12702377Courtesy of BMW OF NORTH AMERICA, INC.

Required follow-up work: