LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2016 >> Z4 sDrive35is >> Repair and Diagnosis >> External Pages >> Different car >> Section 567 (Heating And Air Conditioning - Repair) >> Heater With Operation >> 64 11 198 Removing and installing/replacing complete rear air conditioner (F02 only)

64 11 198 Removing and installing/replacing complete rear air conditioner (F02 only)

WARNING: This page does not describe the selected car, but rather 18 other vehicles, including the 2015 BMW Alpina B7L xDrive, 2015 BMW Alpina B7 xDrive, 2015 BMW 750i xDrive, 2015 BMW 750Li xDrive, and 2015 BMW 740Li xDrive. However, it is still accessible from the selected car via links, so may be relevant.

Special tools required: 

WARNING: Danger of injury!

Refrigerant circuit is under high pressure!

Avoid contact with refrigerant and refrigerant fluid.

Read and comply with SAFETY INFORMATION .

IMPORTANT: Risk of damage!

Restart engine only when air conditioning system has been correctly filled.

Follow notes for OPENING AND REPLACING PARTS IN REFRIGERANT CIRCUIT .

If air conditioning system is opened for more than 24 hours:

Replace desiccant insert for A/C system. See REPLACING DESICCANT INSERT  or REPLACING DESICCANT INSERT (CAPACITOR REMOVED) .

To ensure that the refrigerant is almost completely drained from the rear air conditioning:

In the diagnosis system under Service functions carry out the instruction for "Draining/filling refrigerant circuit".

Necessary preliminary tasks: 

Release screws (1).

Tightening torque 64 53 5AZ .

Carefully detach refrigerant lines (3) downwards from expansion valve (2).

Installation note: 

Replace sealing rings.

Use special tool 00 9 030 to mount sealing rings without damaging them.

Fig 1: Identifying Refrigerant Lines, Expansion Valve And Screws
G06886166Courtesy of BMW OF NORTH AMERICA, INC.
Fig 2: Disconnecting Plug Connection
G06886167Courtesy of BMW OF NORTH AMERICA, INC.

Unfasten plug connection (1) and disconnect.

Release screws (4).

Tightening torque 64 11 1AZ .

Lift out expanding rivet (6).

Carefully remove rear air conditioning (2) in direction of arrow.

In so doing, feed first air duct (3) then air duct (5) out of respective connecting pieces.

Installation note: 

Make sure retaining lug (1) is correctly latched in guide (2) on rear air conditioning (3).

Fig 3: Identifying Retaining Lug, Guide And Rear Air Conditioning
G06886168Courtesy of BMW OF NORTH AMERICA, INC.

Installation note: 

Treat burr on punched body passage (2) with underbody protection.

If necessary, renew sealant on gaiter (1).

Fig 4: Identifying Sealant On Gaiter And Body Passage
G06886169Courtesy of BMW OF NORTH AMERICA, INC.

After installation: 

Replacement: