2.0 Start-Up
WARNING: This page is about a different car, the 2013 BMW Z4, 2012 BMW Z4, 2011 BMW Z4, 2010 BMW Z4, and 2009 BMW Z4. However, it is still accessible from the selected car via links, so may be relevant.
- Open pressure vessel and introduce cavity sealant in form of a 1-litre can.
- Connect spray hose to quick-connect coupling.
- Connect apparatus to compressed air supply.
Working pressure 2-6 bar, max. 8 bar!
Close pressure vessel.