LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2016 >> Z4 sDrive35is >> Repair and Diagnosis >> External Pages >> Different car >> Section 378 (Heating And Air Conditioning - Repair) >> 6450 Air Conditioning System >> 64 52... Instructions for opening and replacing parts in refrigerant circuit >> Notes

64 52... Instructions for opening and replacing parts in refrigerant circuit: Notes

WARNING: This page is about a different car, the 2013 BMW Z4, 2012 BMW Z4, 2011 BMW Z4, 2010 BMW Z4, and 2009 BMW Z4. However, it is still accessible from the selected car via links, so may be relevant.
WARNING:
IMPORTANT:
  • Always use new O-rings each time A/C connections are opened (refer to Electronic Parts Catalogue)

    They must not  be coated.

    Use special tool 00 90 30 Keil to install sealing rings without damaging them.

  • Open the refrigerant circuit for as short of a period as possible.
  • Close all components and lines in the refrigerant circuit and return parts immediately  following the removals at openings with special tool 32 1 270 to prevent penetration of moisture or foreign objects.
  • If the refrigerant circuit was closed at the openings with special tool 32 1 270 but it remains open for more than 24 hours, the dryer insert for the air conditioning must be replaced.