11 12 100 Removing and installing cylinder head (N47 D20 O1)
Special tools required:
Fit new cylinder head bolts.
Do not wash off bolt coating.
Jointing torque and angle of rotation must be observed without fail (risk of damage!) .
Necessary preliminary tasks:
- Disconnect ground cable from battery. See 61 20 900 DISCONNECTING AND CONNECTING BATTERY NEGATIVE LEAD .
- Remove CYLINDER HEAD COVER .
- Check TIMING .
- REMOVE intake plenum.
- Undo EXHAUST TURBOCHARGER from exhaust manifold.
- Drain and dispose of COOLANT .
- REMOVE EXHAUST-GAS RECIRCULATION COOLER
- DISCONNECT COOLANT HOSES .
Release coolant drain plug on engine block (if fitted).
Tightening torque: 11 11 2AZ .
Installation note:
Replace sealing ring.
Turn engine with special tool 11 6 480 in direction of rotation until the piston at the first cylinder is in the "top dead center" top position.
Secure flywheel with special tool 11 5 320 in the TDC firing position of cylinder 1.
Remove CHAIN TENSIONER .
Release camshaft bolts (1).
Tightening torque: 11 31 1AZ .
Remove sprocket.
Risk of damage to oil spray nozzle.
Release bolts (1) from outside to inside.
Remove camshaft carrier with camshafts.
Release screws (1).
Release screws (1).
Release cylinder head bolts in sequence 10 to 1.
Installation note:
Before cleaning the sealing surfaces using the special tools 11 4 471 and 11 4 472 the risers for the oil ducts must be sealed.
Seal oil duct at front using special tool (B) from tool set 2 364 711 .
Seal oil ducts at rear using special tool (B) from tool set 2 364 711 .
Seal oil duct at center using special tool (C) from tool set 2 364 711 .
Remove coarse residues on sealing surfaces with special tool 11 4 471 from cylinder head and crankcase.
Graphic N52.
Remove fine residues on sealing surfaces with special tool 11 4 472 from cylinder head and crankcase.
There must be no coolant, water or engine oil in the pocket holes.
Risk of cracking and corrosion!
Clean all blind holes.
Graphic N52.
Remove cylinder head and set down in such a way that glow elements are not damaged.
If necessary, remove glow elements with special tool 11 6 050 .
Installation note:
Without repair work on the engine block which alters the piston protrusion, use a new cylinder head gasket with the same gasket thickness (number of holes).
If repair work is carried out on the crank drive or piston, the gasket thickness must be redetermined.
Measuring the piston protrusion:
Fit dial gauge with measuring fixture special tool 00 2 530 on cleaned cylinder sealing surface and set under preload to zero.
Clean piston at measuring points (1 and 2).
Fit dial gauge at measuring point (1) on cleaned piston and determine highest point by rotating crankshaft.
Measure and note down piston protrusion at measuring points (1 and 2) on all 4 pistons.
Installation note:
DETERMINE THICKNESS OF CYLINDER HEAD GASKET .
Position special tool 00 2 530 with dial gauge (1) on cylinder head.
Set dial gauge (1) to zero.
Position special tool 00 2 530 with dial gauge (1) on valve.
Determine VALVE UNDER PROTRUSION .
Check fitting sleeves (1) for damage and correct installation position.
Fit new cylinder head bolts.
Do not wash off bolt coating.
Jointing torque and angle of rotation must be observed without fail (risk of damage!) .
Fit new cylinder head gasket with previously determined gasket thickness (number of holes).
Fit cylinder head and secure with new bolts, tightening in the sequence 1 to 10.
Tightening torque: 11 12 1AZ .
Secure cylinder head bolts (1) with special tool 00 9 120 .
Install and tighten down screws (1).
Install and tighten down screws (1).
Make sure that the hydraulic valve clearance compensating element (1) is installed in the correct position.
Make sure roller cam followers (1) are in correct installation position.
Risk of damage! to engine valves.
Place camshaft carrier on cylinder head.
Tightening torque: 11 31 3AZ .
Tighten bolts in sequence (1 to 14).
Place special tool 11 8 760 on exhaust camshaft.
Install chain sprocket with timing chain.
Insert camshaft bolts (1).
Tighten camshaft bolts (1) to 10 Nm.
Release camshaft bolts (1) by 90°.
Install CHAIN TENSIONER (1).
Tighten camshaft bolts (1).
Tightening torque: 11 31 1AZ .
Assemble engine.
Cooling system . See 17 00 039 VENTING AND FILLING COOLING SYSTEM WITH VACUUM FILLING UNIT or 17 00 008 DRAINING AND TOPPING UP COOLANT (N20, N55, N52T, N47 D20 O 1, N57 D30 O/T 1, B47) must be topped up, vented and checked for watertightness.