11 65 030 Removing and installing/replacing left exhaust turbocharger, cylinders 5-8 (S63)
Special tools required:
- 32 1 260
- 2 249 171 .
Risk of mixing up vacuum hoses.
Necessary preliminary tasks:
- Remove CATALYTIC CONVERTERS 5 to 8.
Release hose clamps (1 to 4).
Detach coolant hoses.
Place coolant lines to one side.
Release clamps (1).
Replace clamps.
Release screw (2).
Tightening torque 13 71 5AZ .
Detach right air duct (3) from exhaust turbocharger and remove.
Detach left air duct (4) from exhaust turbocharger and remove.
Installation note:
Secure central bolt with special tool 32 1 260.
Release screws (1).
Tightening torque 13 71 4AZ .
Unlock and detach engine vent line (2).
Disconnect clean air pipe (3) from exhaust turbocharger and remove.
Release screw (1) with a suitable tool.
Tightening torque 11 42 8AZ .
Release screw of V-band clamp (1).
Open V-band clamp (1).
Remove turbocharger with oil return line in upward direction.
Release screw (1).
Tightening torque 11 42 5AZ .
Release banjo bolt (3).
Tightening torque 11 42 4AZ .
Installation note:
Replace sealing ring.
Release screws (1).
Tightening torque 11 42 8AZ .
Remove oil return pipe (2).
Installation note:
Replace seal .
Risk of fire if an engine oil pipe is leaking.
The thermal linear compensators (see arrows) on the oil return pipe (1) must not be mechanically deformed.
Installation note:
Moisten oil return pipe at end with engine oil.
Installation note:
If necessary, remove OIL RETURN COVER .
Replace O-rings (1) on oil return cover (2) .
Replace gaskets (1).
Position turbocharger with oil return line on exhaust manifold.
Position V-band clamp (1).
Tightening torque 11 65 1AZ .
Fit special tool 2 249 171 on left and right cylinder head covers with screws (1 and 2).
Installation note:
Both exhaust turbochargers must be adapted to the catalytic converters.
Exhaust turbocharger (2) must be aligned in the vertical axis on the left and right.
Move screw (1) of setting gauge up against exhaust turbocharger (2) by hand.
Adjust exhaust turbocharger (2) parallel to setting gauge.
Secure V-band clamps.
Graphic of cylinders 1 to 4.
Screw connection of V-band clamp is too loose:
If you can see a gap between the ends of the V-band clamps, release and then repeat the screw connection.
Tightening torque 11 65 1AZ .
Screw connection of V-band clamp is too tight:
If the ends of the V-band clamp are positioned under each other, release and then repeat the screw connection.
Tightening torque 11 65 1AZ .
Installation note:
The ends of the V-band clamp must rest parallel to each other.
Tightening torque 11 65 1AZ .
Assemble engine.
Check vacuum connections.
Observe BMW diagnosis instructions.
- Complete vehicle
- Power train
- Engine electrical system
- Air supply
- Charging pressure control