11 22 500 Removing and installing/replacing flywheel (N20, N26)
Special tools required :
Necessary preliminary tasks :
- Remove transmission. See appropriate procedure:
- Remove CLUTCH .
Automatic transmission :
Secure flywheel (1) with special tool 11 9 260 .
Unfasten flywheel studs.
Tightening torque 11 22 1AZ .
Installation note :
Flywheel (1) is secured with an dowel pin.
Clean all threads for flywheel bolts in crankshaft.
Fit new flywheel bolts.
Manual transmission :
Fasten dual-mass flywheel with special tool 11 9 260 .
Release flywheel bolts with special tool 11 4 180 /
Tightening torque 11 22 2AZ .
Installation note :
Flywheel is secured with a dowel pin.
Fit new flywheel bolts.
Clean all threads for flywheel bolts in crankshaft.
Remove flywheel.
Installation note :
Pay attention to dowel pin.
Ensure installed position of magnet wheel is correct.
Assemble engine.