11 12 040 Removing and installing all ignition coil and injector wells (N55 Hybrid)
WARNING:
Compliance with the following points is mandatory before beginning work:
- Observe SAFETY INFORMATION for handling electric vehicles.
Necessary preliminary work:
- Remove CYLINDER HEAD COVER .
- REMOVE all injectors.
Release screws (1).
Tightening torque: 11 12 8AZ .
Check fitting bushes (1) for damage.
Installation note:
Replace gasket (2).
Assemble engine.