11 65 020 Removing and installing/replacing exhaust turbocharger (N55)
The weight of the turbocharger is approx. 15 kg.
Necessary preliminary tasks:
- Remove the CATALYTIC CONVERTER .
- Remove CHARGE AIR DUCT .
- Drain COOLANT .
- Remove EXPANSION TANK .
- Remove AIR DUCT
- Remove right engine mount . See 22 11 001 REPLACING RIGHT ENGINE MOUNT (N55) or 22 11 001 REPLACING RIGHT ENGINE MOUNT (N55) AWD .
Release screws (1).
Tightening torque 11 53 4AZ .
Release screw (1).
Tightening torque 11 53 10AZ .
If necessary, use appropriate tool to loosen coolant return line (3) and coolant flow line (2) at connection point.
Installation note:
Replace sealing rings.
Release screw (1).
Loosen screws (3) but do not remove.
Release screw (1).
Tightening torque 11 42 6AZ .
If necessary, use appropriate tool to loosen oil return lines (2).
Installation note:
Replace sealing ring.
Release screw (1).
Tightening torque 11 42 7AZ .
If necessary, use appropriate tool to loosen oil return lines (2).
Oil may escape when the oil return line is disconnected.
Installation note:
Replace sealing ring.
Release screw (1).
Tightening torque: 11 42 4AZ .
If necessary, use appropriate tool to loosen coolant return lines (2) at connection point.
Installation note:
Replace sealing ring.
Loosen plug connection (1) at blow-off valve.
Release screw (2).
Tightening torque 11 65 4AZ .
If necessary, use appropriate tool to loosen oil feeder lines at point of connection (3).
Oil may escape when the oil return line is disconnected.
Installation note:
Replace sealing ring.
Disconnect vacuum hose (1) from vacuum line.
Disconnect vacuum hose (1) from cylinder head cover.
Remove heat shield (1).
Tightening torque: 11 65 2AZ
Loosen all flange nuts (2) along the line.
Remove module by maneuvering downwards on gearbox side.
Release screw (1).
If necessary, use appropriate tool to loosen oil feeder lines at point of connection (2).
Installation note:
Replace all sealing rings (1).
Installation note:
Replace all graphite seals (1).
Position exhaust turbocharger on cylinder head and hold in place with two bolts.
Insert bolt (1) but do not tighten at this point.
Torque and tightening sequence must be observed without fail.
Tightening torque: 11 65 1AZ .
- Join all flange nuts in sequence 1 to 15 to 8 Nm.
- Tighten all flange nuts to a torque of 13 Nm in sequence (1 to 15).
Installation note:
Flange nuts 1 to 5 are accessible from above.
Flange nuts 6 to 15 are accessible from below.
Secure screws (3).
Tightening torque: 11 65 9AZ .
Tighten bolt (1).
Tightening torque 11 65 8AZ .
Top up with COOLANT .
Assemble engine.
Observe BMW Diagnosis System instruction.
Carry out BMW leakage test for intake system.