11 65 020 Removing and installing/replacing exhaust turbocharger (N20)
Necessary preliminary tasks:
- Remove left trailing link .
- Remove clean air pipe See 11 15 001 REMOVING AND INSTALLING/REPLACING THE ENGINE VENTILATION LINE WITH AND WITHOUT HEATING ELEMENT N20) ; 13 71 155 REMOVE CLEAN AIR PIPE (N20) and 13 71 165 REMOVING BOTTOM CLEAN AIR PIPE (N20) .
- Drain coolant.
- Remove EXPANSION TANK .
- Remove CHARGE AIR COOLER .
- Remove the CATALYTIC CONVERTER .
- Drain ENGINE OIL .
Release sheet metal nuts (1).
Unfasten screws (2).
Remove heat shield (3).
Disconnect vacuum hose (1) from vacuum line.
Disconnect plug connection (2) on blow-off valve.
Unlock retaining clip (1) with a screwdriver in direction of arrow and hold.
Pull off retaining clip (1) with suitable pliers in direction of arrow.
Pull off wastegate linkage (2) from wastegate flap.
Release screws (1).
Tightening torque: 11 65 4AZ .
Remove vacuum unit.
Unclamp engine wiring harness (1) from bracket.
Release screw (1).
Tightening torque: 11 00 2AZ .
Release screw (1).
Release oil return pipe (3) and place to one side.
Unfasten screws (2).
Tightening torque 11 42 6AZ .
Release screw (1).
Tightening torque 11 42 6AZ .
Remove oil return line (2).
Installation note:
Replace O-ring.
Release screw (1).
Tightening torque 11 53 10AZ .
If necessary, use appropriate tool to loosen coolant return line (3) and coolant flow line (2) at connection point.
Installation note:
Replace sealing rings.
Release screw (1).
Tightening torque: 11 42 4AZ .
If necessary, use appropriate tool to loosen coolant return lines (2) at connection point.
Installation note:
Replace sealing ring.
Release nuts (1 to 10).
Tape off engine support at front right with suitable auxiliary materials (risk of damage!).
Push exhaust turbocharger (1) carefully toward the front in direction of arrow.
Turn exhaust turbocharger (1) and remove from above.
Release screw (1).
If necessary, use appropriate tool to loosen oil feeder lines at point of connection (2).
Installation note:
Replace all sealing rings (1).
Renew sealing rings of coolant RETURN and FEED LINES .
Installation note:
Replace all graphite seals (1).
Position turbocharger on cylinder head and hold in place with two bolts.
Torque and torque sequence must be observed without fail.
Tightening torque: 11 65 1AZ .
- Join all flange nuts to a torque of 8 Nm in sequence (1 to 10).
- Tighten all flange nuts to a torque of 13 Nm in sequence (1 to 10).
Installation note:
If screw (1) cannot be secured, holder must be released.
Secure screws (1).
Tightening torque: 11 65 6AZ .
Assemble engine.
Observe BMW Diagnostics System instruction.
Carry out BMW leak test for intake system.