12 42 500 Replacing the positive battery cable between the starter motor, alternator and positive battery connection point (N54)
WARNING: This page is about a different variant/trim than selected.
Necessary preliminary tasks:
- Read out the fault memory of the DME control units.
- Switch off ignition.
- Disconnect BATTERY EARTH LEAD .
- Remove INTAKE PLENUM .
Open cover.
Slacken nut (1).
Tightening torque 12 42 3AZ .
Remove positive battery cable lead (2) from positive battery connection point.
Release nut (1) on starter motor.
Tightening torque 12 42 2AZ .
Disconnect positive battery cable from starter motor.
Release nut (2) on alternator.
Tightening torque 12 42 1AZ .
Feed out positive battery cable from clamp (3) and remove.
NOTE:
Reassemble the vehicle.
Check stored fault messages.
Delete fault memory.
Check stored fault messages.
Delete fault memory.