72 12 060 Removing and installing or replacing left or right head airbag
Special tools required:
Incorrect handling can activate airbag and cause injury.
Necessary preliminary tasks:
- Disconnect BATTERY NEGATIVE CABLE
- Follow INSTRUCTIONS for unlocking and locking airbag plug connections
- Remove HEADLINING
Lay out protective mats in the relevant working area:
- Dashboard
- Entrance area
- Passenger compartment
Overview of head airbag:
Unfasten PLUG CONNECTION (1) and disconnect.
Drill following off rivet plate down to rivet shank with a 10 mm twist drill bit.
Drill open front rivet plate.
Drill open rear rivet plate.
Carefully lever out holders for folding pack from body with plastic wedge.
Unfasten screws (2).
Tightening torque 72 12 03AZ .
Remove head airbag.
- In the event of a bent or faulty pin or apparent riveting when the gas generator is removed, it will be necessary to replace the complete head airbag
Remove shafts of blind rivets flush with panel (holder of handle).
Deburr remaining rivets with nipper pliers.
Use hammer and 6 mm punch to drive out rivet stem.
Installation note:
Apply primer to damaged paintwork on side frame.
Remove all rivet residues.
Rivet head (1) must be caught with special tool when removing it from the body.
Special tool 72 1 210 for collecting rivet remnants.
Shank (1) of special tool is flexible and can be adapted to the relevant body contours.
Insert special tool 72 1 210 through bore hole in body next to attachment points.
Position special tool from rear on rivet head in cavity.
Make sure collecting tray is correctly fitted on rivet head.
Drive out stem with hammer and 6 mm punch.
Carefully feed special tool out of body so that rivet head does not fall out of collecting tray.
For details of procedure for filling cavities with foam, see further operations.
Use cavity preservation (obtainable via BMW) for foam filling.
Cavity foam can also be used if necessary.
Preparing tube for foam can:
Slide hose (1) at least 6 cm into hose (2).
Cut end of hose (1) at an angle.
Apply marking (3) 15 cm from end of hose.
Fit hose to foam can.
Foaming the rivet head:
Slide in hose through A-pillar hole up to marking from the top down.
Fill cavity in an operation lasting 0, 5 seconds.
Can may burst if not completely emptied.
Overview of rivet gun:
Riveting of gas generator housing and holders for folding pack with rivet gun.
The interchangeable head is changed for the different work operations.
Riveting of holders for folding pack:
2.) 17/40 nosepiece and long shank
Holders for folding pack riveted 5 times with blind rivet dia. 6.4 mm.
Installation note:
Avoid rivet inclination.