LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2014 >> M6 2D Convertible, Standard Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 8 (General Electrical System - Repair - F13) >> Plug Connection, Terminal, Power Distribution Box >> 61 13... Notes for opening contacts and locks of different plug contact systems >> 61 13... Socket housing 42-, 43-pin, Hybrid System MQS/MPQ

61 13... Socket housing 42-, 43-pin, Hybrid System MQS/MPQ

WARNING: This page is about a different variant/trim than selected.

Special tools required: 

Manufactured by AMP:  The following contact types without strand sealing can be fitted in the socket housings:

Open secondary locks (1) on socket housing.

Press back retaining hook of MQS contacts (2) with special tool 61 0 312 61 1 134 and pull out cable with contact.

Press back retaining hook of MPQ contacts (3) with screwdriver and pull out cable with contact.

Fig 1: Pressing Retaining Hooks
G10063852Courtesy of BMW OF NORTH AMERICA, INC.

Installation note: 

Bend open retaining hook of contacts gently before inserting into connector housing.

For installation of contacts, observe chamber numbers on reverse side of socket housing.

Fig 2: Identifying Chamber Numbers On Reverse Side Of Socket Housing
G10063853Courtesy of BMW OF NORTH AMERICA, INC.