Procedure steps
WARNING: This page is about a different variant/trim than selected.
SPECIAL TOOLS AND TIGHTENING TORQUES:
For additional information on special tools and tightening torques pertaining to this procedure, refer to the following:
PRE-PROCESSES:
- Reading out the fault memory
- Connect diagnosis system.
Check
- Read out fault memory.
Result
» Fault code entry present.
Measure
- Delete the fault memory, if applicable, run ABL.
- Connect diagnosis system.
- Removing the acoustic cover
- Raise acoustic cover (1).
- Remove acoustic cover (1) in the direction of travel.
KEY PROCESSES:
- Removing hot film air mass meters on the left and right
Prerequisite
Switch off ignition.
NOTE: Description is for left component only. Procedure on the right side is identical.- Unlock connector (1) and remove.
- Loosen screws (2).
- Pull hot film air mass meter (3) out of upper section of intake silencer housing.
- Installing hot film air mass meter on the left and right NOTE: Description is for left component only. Procedure on the right side is identical.
- Install new gasket on hot film air mass meter (3).
- Install hot film air mass meter (3) in upper section of the intake silencer housing.
- Tighten down screws (2).TIGHTENING TORQUES SPECIFICATION
Hot film air mass meter to upper section of intake silencer housing 3, 5 Nm - Connect connector (1).
POST PROCESSES:
- Install acoustic cover
- Insert acoustic cover (1) into existing rubber guides.