LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2014 >> M6 2D Convertible, Standard Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 853 (Fuel System - Repair - F31) >> 1353 Injection Nozzle And Lines >> 13 53 170 Removing and installing/replacing pressure lines to the injectors (N47 D16/20 K/U/O/T 1))

13 53 170 Removing and installing/replacing pressure lines to the injectors (N47 D16/20 K/U/O/T 1))

WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2016 BMW 328i xDrive, 2016 BMW 328d xDrive, 2015 BMW 328i xDrive, 2015 BMW 328d xDrive, and 2014 BMW 328i xDrive. However, it is still accessible from the selected car via links, so may be relevant.

Special tools required: 

IMPORTANT: When working on the oil, coolant or fuel circuit, you must protect the alternator against contamination.
Cover alternator with suitable materials.
Failure to comply with this procedure may result in an alternator malfunction.
IMPORTANT: After the engine has stopped, wait at least 1 minute before releasing the high pressure lines.
After disconnecting the pressure lines, it is absolutely essential to seal the injectors and the high-pressure accumulator with protective caps.
Do not mix up new pressure lines.

Necessary preliminary tasks: 

Recycling: 

Catch and dispose of escaping fuel.

Observe country-specific waste disposal regulations.

Release all union nuts of the pressure lines with special tool 37 1 152 .

NOTE: Reset special tool in good time to prevent bending of pressure lines.
Fig 1: Locating Pressure Lines Union Nuts
G09945889Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: Risk of damage to injection system and pressure accumulator!
Observe tightening torque 13 53 2AZ without fail If the pressure lines are leaking after installation, they must be replaced. Do not retighten pressure lines with a higher tightening torque!
Risk of damage to injector and pressure accumulator!

Installing pressure lines 

IMPORTANT: Risk of injector breakage! Observe tightening torque 13 53 2AZ without fail.
All pressure lines may only be reused 3 times; after the 3rd time, they must be replaced.
  1. Insert pressure lines.
  2. Hand-tighten all union nuts on pressure lines.
  3. Tighten down union nuts on injectors to specified torque.

    Tightening torque 13 53 2AZ .

  4. Tighten down union nuts on pressure accumulator to specified torque.

    Tightening torque 13 53 2AZ .

  5. Check all components of common rail system for tightness.

Reassemble the vehicle.

Bleed fuel system via BMW diagnosis system.

Check fuel system for tightness.