LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2014 >> M6 2D Convertible, Standard Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 807 (Heating And Air Conditioning - Repair) >> Compressor >> 64 52 530 Removing and installing/replacing electric A/C compressor

64 52 530 Removing and installing/replacing electric A/C compressor

WARNING: This page does not describe the selected car, but rather 50 other vehicles, including the 2016 BMW M5, 2016 BMW ActiveHybrid 5, 2016 BMW 550i xDrive, 2016 BMW 550i, and 2016 BMW 535i xDrive. However, it is still accessible from the selected car via links, so may be relevant.
WARNING: High-voltage system - danger to life!
The following points must be strictly observed prior to starting work  :
WARNING: Danger of injury!
Refrigerant circuit is under high pressure!
Avoid contact with refrigerant and refrigerant oil.
IMPORTANT: Risk of damage! Restart engine only when A/C system has been correctly filled.
Read and comply with NOTES ON REPLACING COMPRESSOR .

Follow notes for OPENING AND REPLACING PARTS in refrigerant circuit.

If air conditioning system is opened for more than 24 hours: REPLACE DESICCANT INSERT FOR AIR CONDITIONING .

Necessary preliminary tasks: 

Release screws (1) from air conditioning lines (2).

Installation note: 

Replace sealing rings.

Tightening torque 64 52 1AZ .

Fig 1: Identifying Air Conditioning Lines And Screws
G09929494Courtesy of BMW OF NORTH AMERICA, INC.

Release screw (1). Remove holder (2) with air conditioning lines (3) and spacer sleeve (4).

Tightening torque 64 52 6AZ .

IMPORTANT: Risk of damage!
Do not fit holder (2) without spacer sleeve (4).

Remove air conditioning lines (3) from electric A/C compressor (5) upwards and place to one side.

Installation note: 

Air conditioning lines (3) must not be set against belt (6)!

Check distance between air conditioning lines (3) and belt (6) in area (7)!

If necessary, adjust holder (2) so that distance is at least 2 cm.

Fig 2: Identifying Holder, Screw, Spacer Sleeve, Drive Belt, And Air Conditioning Lines
G09929495Courtesy of BMW OF NORTH AMERICA, INC.

Unlock and disconnect high-voltage plug connection (3). Detach high-voltage cable (4) at position marked with arrow and place to one side.

IMPORTANT: OBSERVE NOTE ON UNLOCKING AND DISCONNECTING different plug connections!

Unlock plug connection (5) and disconnect.

Unfasten plug connection (2) and disconnect.

NOTE: Raise unlocking device upward. Press unlocking device and pull off plug connection (2) upwards.

Detach line (1) at position marked with arrows and place to one side.

Fig 3: Identifying High-Voltage Cable, Plug Connections, And Line
G09929496Courtesy of BMW OF NORTH AMERICA, INC.

Release screws (1) from electric A/C compressor (2). Remove electric A/C compressor (2).

Tightening torque: 64 52 3AZ .

Release screws (3) and remove both holders (4, 5).

Tightening torque: 12 31 2AZ

Fig 4: Identifying Electric A/C Compressor, Screws And Holders
G09929497Courtesy of BMW OF NORTH AMERICA, INC.

Position electric A/C compressor (1) as shown in graphic and feed out upwards.

Fig 5: Identifying Electric A/C Compressor
G09929498Courtesy of BMW OF NORTH AMERICA, INC.

After installation: