LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2014 >> M6 2D Convertible, Standard Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 771 (Fuel System - Repair) >> Sensor For Control Unit >> 13 62 561 Removing and installing or replacing both hot film air mass meters

13 62 561 Removing and installing or replacing both hot film air mass meters

WARNING: This page does not describe the selected car, but rather 50 other vehicles, including the 2016 BMW M5, 2016 BMW ActiveHybrid 5, 2016 BMW 550i xDrive, 2016 BMW 550i, and 2016 BMW 535i xDrive. However, it is still accessible from the selected car via links, so may be relevant.

Overview of Activities 

Preprocesses 

  1. Read out fault memory. See  1
  2. Remove acoustic cover. See  2

    Keyprocesses 

  3. Removing hot film air mass meters on the left and right. See  3
  4. Installing hot film air mass meter on the left and right. See  4

    Postprocesses 

  5. Install acoustic cover. See  5

Additional Information 

Overview of Tightening Torques 

TIGHTENING TORQUE SPECIFICATIONS

Use in Activity: 4
Hot film air mass meter to upper section of intake silencer housing 
3.5 Nm

Preprocesses

  1. Read out fault memory 
    • Connect diagnosis system.

      Check 

    • Read out fault memory.

    desired state 

    Result 

    » Fault entry present.

    Measure 

    • Delete fault memory, if necessary, execute test modules.
  2. Remove acoustic cover 
    • Raise acoustic cover (1).
    • Remove acoustic cover (1) in the direction of travel.
      Fig 1: Identifying Acoustic Cover
      G09873698Courtesy of BMW OF NORTH AMERICA, INC.

    Keyprocesses 

  3. Removing hot film air mass meters on the left and right 

    Prerequisite 

    Switch off ignition.

    NOTE: Description is for left component only. Procedure on the right side is identical.
    • Unlock connector (1) and remove.
    • Loosen screws (2).
    • Pull hot film air mass meter (3) out of upper section of intake silencer housing.
      Fig 2: Identifying Hot Film Air Mass Meter, Connector And Screw
      G06179016Courtesy of BMW OF NORTH AMERICA, INC.
  4. Installing hot film air mass meter on the left and right 
    NOTE: Description is for left component only. Procedure on the right side is identical.
    • Install new gasket on hot film air mass meter (3).
    • Install hot film air mass meter (3) in upper section of the intake silencer housing.
    • Tighten down screws (2).
      TIGHTENING TORQUE SPECIFICATIONS

      Hot film air mass meter to upper section of intake silencer housing 
      3.5 Nm
    • Connect connector (1).
      Fig 3: Identifying Hot Film Air Mass Meter, Connector And Screw
      G06179016Courtesy of BMW OF NORTH AMERICA, INC.

    Postprocesses 

  5. Install acoustic cover 
    • Insert acoustic cover (1) into existing rubber guides.
      Fig 4: Identifying Acoustic Cover
      G09873698Courtesy of BMW OF NORTH AMERICA, INC.