LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2014 >> M6 2D Convertible, Standard Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 707 (Fuel System - Repair) >> Intake Silencer >> 13 71 190 Removing and installing/replacing left clean air pipe \PREMIUM

13 71 190 Removing and installing/replacing left clean air pipe \PREMIUM

WARNING: This page does not describe the selected car, but rather 21 other vehicles, including the 2017 BMW 550i GT xDrive, 2017 BMW 535i GT xDrive, 2017 BMW 535i GT, 2016 BMW 550i GT xDrive, and 2016 BMW 535i GT xDrive. However, it is still accessible from the selected car via links, so may be relevant.

Overview of Activities 

Preprocesses 

  1. Remove acoustic cover

    Keyprocesses 

  2. Remove left clean air pipe.
  3. Install left clean air pipe

    Postprocesses 

  4. Install acoustic cover

Additional Information 

Overview of Tightening Torques 

TIGHTENING TORQUE SPECIFICATIONS

Clean-air pipe to turbocharger 
M6 10 Nm

Preprocesses 

  1. Remove acoustic cover 
    • Raise acoustic cover (1).
    • Remove acoustic cover (1) in the direction of travel.
      Fig 1: Identifying Acoustic Cover
      G09873698Courtesy of BMW OF NORTH AMERICA, INC.

      Keyprocesses 

  2. Remove left clean air pipe  .
    • Version 1: 
      1. Unlock the retainer.
      2. At the same time, pull off connecting line from clean air pipe.
        Fig 2: Identifying Retainer And Clean Air Pipe
        G09873711Courtesy of BMW OF NORTH AMERICA, INC.
    • Version 2: 
    • Lightly pull line (1) in the direction of the arrow.

      Simultaneously, unlock the latch mechanisms (2) one after the other using a screwdriver (3).

      Pull off connecting line from clean air pipe.

      Fig 3: Identifying Latch Mechanisms, Line, And Screwdriver
      G09873712Courtesy of BMW OF NORTH AMERICA, INC.
    • Release screw (1).
    • Pull clean air pipe (2) from exhaust turbocharger.
      Fig 4: Identifying Clean Air Pipe And Screw
      G09873713Courtesy of BMW OF NORTH AMERICA, INC.
  3. Install left clean air pipe 
    • Check the gasket on the clean air pipe.
    • Replace faulty gasket.
    • Position clean air pipe (2) on exhaust turbocharger.
    • Tighten down screw (1).
      TIGHTENING TORQUE SPECIFICATIONS

      Clean-air pipe to turbocharger 
      M6 10 Nm
      Fig 5: Identifying Clean Air Pipe And Screw
      G09873713Courtesy of BMW OF NORTH AMERICA, INC.
    • Version 1: 
      NOTE: Ensure correct locking of all the retaining lugs. Retaining lugs must audibly snap into place.
    • Attach connecting line to clean air pipe.
      Fig 6: Attaching Connecting Line To Clean Air Pipe
      G09873743Courtesy of BMW OF NORTH AMERICA, INC.
    • Version 2: 
      NOTE: Ensure correct locking of all the retaining lugs. Retaining lugs must audibly snap into place.
    • Attach connecting line (1) with the latch mechanisms (2) to clean air pipe.
      Fig 7: Attaching Connecting Line With Latch Mechanisms To Clean Air Pipe
      G09873744Courtesy of BMW OF NORTH AMERICA, INC.

      Postprocesses 

  4. Install acoustic cover 
    NOTE: Ensure correct fit!
    • Insert acoustic cover (1) into existing rubber guides.
      Fig 8: Identifying Acoustic Cover
      G09873698Courtesy of BMW OF NORTH AMERICA, INC.