33 32 051 Replacing left or right push rod/integral link
WARNING: This page is about a different car, the 2013 BMW 550i GT, 2012 BMW 550i GT, 2011 BMW 550i GT, and 2010 BMW 550i GT. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
If the integral link is detached from the swinging arm, it will be necessary to carry out the wheel alignment procedure
. See 32 00 150 KDS CHASSIS/WHEEL ALIGNMENT CHECK WITH VEHICLE LOAD UP TO DESIGN POSITION
or 32 00 155 KDS WHEEL ALIGNMENT CHECK WITH RIDE HEIGHT MEASUREMENT WITHOUT VEHICLE LOAD
after assembly.
Necessary preliminary work
- Remove REAR WHEEL.
- Deactivate and drain AIR SPRING/SUSPENSION SYSTEM
Release shock absorber on swinging arm.
Tightening torque 33 52 4AZ .
IMPORTANT:
Handle the shock absorber with care so as to avoid damaging the control unit (1) and control valve (2).
Release screw (1).
Tightening torque 33 32 5AZ .
Slacken nut (2).
Tightening torque 33 32 4AZ .
Turn lower shock absorber in direction of arrow and pull out screw (3).
Remove integral link (4).
After installation
- Activate and fill AIR SPRING SYSTEM
- Carry out WHEEL ALIGNMENT PROCEDURE.