LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2014 >> M6 2D Convertible, Standard Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 322 (Fuel System - Repair) >> Throttle And Operation >> 13 54 020 Removing and installing/sealing right throttle valve assembly (N63)

13 54 020 Removing and installing/sealing right throttle valve assembly (N63)

WARNING: This page is about a different car, the 2013 BMW 550i GT, 2012 BMW 550i GT, 2011 BMW 550i GT, and 2010 BMW 550i GT. However, it is still accessible from the selected car via links, so may be relevant.

Necessary preliminary tasks 

NOTE: Picture shows the left throttle valve assembly, the procedure for the right side is identical.

Unlock plug (1) and remove.

Unfasten screws (2).

Tightening torque 13 54 1AZ .

Remove throttle valve assembly (3).

Installation: 

Fig 1: Identifying Throttle Valve Assembly With Plug And Mounting Screws
G08484877Courtesy of BMW OF NORTH AMERICA, INC.

Check plug connection (1) for coolant remnants. If necessary, clean plug connection (1) with compressed air.

Installation: 

Replace sealing ring (1) of throttle assembly (2).

Fig 2: Identifying Sealing Ring And Throttle Assembly
G04755314Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Check stored fault message.

clear fault memory.