LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2014 >> M6 2D Convertible, Standard Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 311 (Steering And Wheel Alignment - Repair) >> Pump And Oil Supply >> 32 41 433 Removing and installing/replacing ARS expansion hose part 4 >> Removing line 1 >> Necessary preliminary tasks

Necessary preliminary tasks

WARNING: This page is about a different car, the 2013 BMW 550i GT, 2012 BMW 550i GT, 2011 BMW 550i GT, and 2010 BMW 550i GT. However, it is still accessible from the selected car via links, so may be relevant.

Release screws (1) from line flange in engine compartment.

Replace sealing ring.

Tightening torque 37 13 8AZ. .

Fig 1: Identifying Line Flange Screws
G08420978Courtesy of BMW OF NORTH AMERICA, INC.

Release screw (1) from holder of oil cooler line over front axle carrier.

Release holder in front axle carrier (see arrow) of pressure line (2).

Fig 2: Releasing Front Axle Carrier Pressure Line Holder
G08475831Courtesy of BMW OF NORTH AMERICA, INC.

Release screw connection (1) on T-piece.

Tightening torque 37 13 5AZ.

Feed out line through wheel arch.

Fig 3: Identifying T-Piece Screw Connection
G08475832Courtesy of BMW OF NORTH AMERICA, INC.