LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2014 >> M5 Standard Trans >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine - Variable Valve Timing Control System (VANOS), Intake Plenum, Turbocharger, Water Pump, Thermostat, Coolant Lines, EGR Valve, EGR Cooler, Oxygen Sensors - Repair >> Turbocharger >> N63 Engine >> 11 65 185 Removing and installing/replacing heat shield at bottom (N63)

11 65 185 Removing and installing/replacing heat shield at bottom (N63)

Necessary preliminary work: 

Release screws (1).

Tightening torque 11 65 3AZ .

Fig 1: Identifying Screws
G06178815Courtesy of BMW OF NORTH AMERICA, INC.

Release screws (1).

Tightening torque 11 65 3AZ .

Remove heat shield (2) towards top.

Fig 2: Identifying Heat Shield And Screws
G06178816Courtesy of BMW OF NORTH AMERICA, INC.

Release screws (1).

Tightening torque 11 65 3AZ .

IMPORTANT: Risk of interchange on replacement of the heat shield.
Other shields are installed in the N63H and S63 engines.
Fig 3: Identifying Heat Shield Screws
G06178817Courtesy of BMW OF NORTH AMERICA, INC.

Release front screws on heat shield (1).

Tightening torque 11 65 3AZ .

Remove heat shield (1) towards top.

IMPORTANT: Risk of interchange on replacement of the heat shield.
Other shields are installed in the N63H and S63 engines.
Fig 4: Identifying Heat Shield
G06178818Courtesy of BMW OF NORTH AMERICA, INC.

Assemble engine.