LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2014 >> M5 Automatic DCT Trans >> Repair and Diagnosis >> Engine Mechanical >> Cooling System (Mechanical) >> Engine - Variable Valve Timing Control System (VANOS), Intake Plenum, Turbocharger, Water Pump, Thermostat, Coolant Lines, EGR Valve, EGR Cooler, Oxygen Sensors - Repair >> Intake Plenum >> N20 Engine >> 11 61 362 Removing and installing/replacing right charge-air duct (N20)

11 61 362 Removing and installing/replacing right charge-air duct (N20)

Unlock snap fastener (1) and (2) and remove the charge air guide.

NOTE: Shown with engine/cooling package removed for better overview.
Fig 1: Identifying Snap Fastener On Exhaust Turbocharger
G09925037Courtesy of BMW OF NORTH AMERICA, INC.

Installation note: 

Visually inspect the form sealing ring (1) for correct position and damage.

VDA couplings are correctly fitted when they snap into place with an audible click.

Fig 2: Identifying Sealing Ring
G09925192Courtesy of BMW OF NORTH AMERICA, INC.

Installation note: 

Visually inspect the form sealing ring (1) for correct position and damage.

VDA couplings are correctly fitted when they snap into place with an audible click.

Fig 3: Identifying Sealing Ring
G09925193Courtesy of BMW OF NORTH AMERICA, INC.

Assemble engine.