LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2013 >> Z4 28i, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 903 (Fuel System - Repair - F12) >> Sensor For Control Unit >> 13 62 561 Removing and installing or replacing both hot film air mass meters

13 62 561 Removing and installing or replacing both hot film air mass meters

WARNING: This page does not describe the selected car, but rather 33 other vehicles, including the 2018 BMW M6, 2018 BMW 650i xDrive, 2018 BMW 650i, 2018 BMW 640i xDrive, and 2018 BMW 640i. However, it is still accessible from the selected car via links, so may be relevant.

Overview of Activities 

Preprocesses 

  1. Reading out the fault memory
  2. Removing the acoustic cover

    Keyprocesses 

  3. Removing hot film air mass meters on the left and right
  4. Installing hot film air mass meter on the left and right

    Postprocesses 

  5. Install acoustic cover

Additional Information 

Overview of Tightening Torques 

Use in Activity: 4
Hot film air mass meter to upper section of intake silencer housing 
  3, 5 Nm

General information 

Preprocesses 

  1. Reading out the fault memory 

    Connect diagnosis system.

    Check 

    Read out fault memory.

    Result 

    Fault code entry present.

  2. Removing the acoustic cover 

    Measure 

    Delete the fault memory, if applicable, run ABL.

    Raise acoustic cover .

    Remove acoustic cover in the direction of travel.

    Fig 1: Identifying Acoustic Cover
    G09873698Courtesy of BMW OF NORTH AMERICA, INC.

    Keyprocesses 

  3. Removing hot film air mass meters on the left and right 

    Prerequisite 

    Switch off ignition.

    NOTE: Description is for left component only. Procedure on the right side is identical.
    Fig 2: Identifying Hot Film Air Mass Meter, Connector And Screws
    G06179016Courtesy of BMW OF NORTH AMERICA, INC.

    Unlock connector and remove.

    Loosen screws .

    Pull hot film air mass meter out of upper section of intake silencer housing.

  4. Installing hot film air mass meter on the left and right 
    NOTE: Description is for left component only. Procedure on the right side is identical.

    Install new gasket on hot film air mass meter .

    Install hot film air mass meter in upper section of the intake silencer housing.

    Tighten down screws .

    TIGHTENING TORQUE SPECIFICATION

    Hot film air mass meter to upper section of intake silencer housing 
      3, 5 Nm

    Connect connector .

    Fig 3: Identifying Hot Film Air Mass Meter, Connector And Screws
    G06179016Courtesy of BMW OF NORTH AMERICA, INC.

    Postprocesses 

  5. Install acoustic cover 

    Insert acoustic cover into existing rubber guides.

    Fig 4: Identifying Acoustic Cover
    G09873698Courtesy of BMW OF NORTH AMERICA, INC.