LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2013 >> Z4 28i, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 311 (Fuel System - Repair (N52)) >> 1354 Throttle And Operation >> 13 54 030 Removing and installing/sealing throttle valve assembly (N52K)

13 54 030 Removing and installing/sealing throttle valve assembly (N52K)

WARNING: This page is about a different car, the 2011 BMW Z4, 2010 BMW Z4, and 2009 BMW Z4. However, it is still accessible from the selected car via links, so may be relevant.

Read and comply with notes on PROTECTION AGAINST ELECTROSTATIC DAMAGE (ESD protection).

Necessary preliminary tasks 

Unlock plug (1) and remove.

Release screws.

Tightening torque 13 54 1AZ .

Remove throttle assembly (2).

Fig 1: Identifying Plug And Throttle Assembly
G04725729Courtesy of BMW OF NORTH AMERICA, INC.

Installation 

Replace sealing ring (1) of throttle assembly (2).

Fig 2: Identifying Sealing Ring And Throttle Assembly
G04725730Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Check stored fault messages.

Now clear the fault memory.