32 11... Replacing gaiter for electric steering gear (EPS) on left or right
Spindle side:
Adhere to the utmost cleanliness.
Do not re-grease the spindle running surface. Sufficient special grease was used during assembly for lifetime filling.
Rack side:
Clean rack and check surface for damage (e.g. by corrosion).
Grease rack (refer to OPERATING FLUIDS ).
Necessary preliminary tasks:
Clean tie rod.
Release band clamp (1).
Mark screw-in depth of tie rod (2) or count thread turns.
Unscrew bolt (3).
Twist tie rod (2) out of tie rod end (4).
Installation:
Replace microencapsulated screw.
For tightening torque refer to 32 21 2AZ in 32 21 STEERING ARMS .
Release Ear Clamp (1).
Detach gaiter (2) from tie rod (3).
Installation:
Read and follow notes/information on spindle and rack sides at the start of the document.
Clean tie rod and apply grease to taper. This ensures that the gaiter is not rotated when the tie rod is rotated.
Release water drain valve (1) (20 A/F) and replace.
Installation:
Fit O-ring (2).
For tightening torque refer to 32 00 3AZ in 32 00 STEERING .
After installation:
- Perform Chassis Alignment Check
- Carry out Steering Angle Sensor Adjustment