41 00... Bonding On Painted Surfaces: Notes
WARNING: This page is about a different car, the 2011 BMW M3, 2010 BMW M3, 2009 BMW M3, and 2008 BMW M3. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT:
Conform with safety regulations
See 4100... SAFETY AT WORK or 4100... INFORMATION ON HAZARDS !
Overview of topics:
- Equipment
- Expiry date of consumables
- Preparation of surface
- Bonding coat
- Hardening times
- Subsequent treatment
- Disposing of adhesive
1.0 Equipment
- CLEANERR1
- Adhesive as specified in repair instructions
- CARTRIDGE GUN
2.0 Expiry date of consumables
- Glue cartridge is marked with a date.
- Do not use adhesive after this date.
3.0 Preparation of surface
4.0 Adhesive application
- Processing temperature of glue cartridge 18°C - 30°C.
- Object temperature, vehicle and new parts, min. 15°C.
- Do not use any compressed-air-operated cartridge guns.
- Insert glue cartridge in cartridge gun, remove cap and allow both adhesive components to emerge. Strip adhesive components uniformly and attach mixing tube.
- Allow approx. 10 cm of mixed adhesive to emerge and then apply the mixed adhesive first on one side of the bonding surface.
- After applying the adhesive, check whether an adhesive component has emerged at the back of the cartridge. If yes, break off the bonding procedure. Clean new part. Use new glue cartridge. Contact national hotline.
- Potlife of mixed adhesive approx. 2 hours. A change of mixer is only necessary if over a period of 30 minutes no material has flowed through the mixer.
- Join components and secure in position.
- Remove excess adhesive.