LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2013 >> X6 50i >> Repair and Diagnosis >> External Pages >> Different car >> Section 1018 (Engine - Repair (N54)) >> Engine General >> 11 00 050 Removing and installing engine (N54)

11 00 050 Removing and installing engine (N54)

WARNING: This page is about a different car, the 2010 BMW X6, 2009 BMW X6, and 2008 BMW X6. However, it is still accessible from the selected car via links, so may be relevant.

Special tools required: 

See ENGINE - SPECIAL TOOLS (N54, N63) .

IMPORTANT: Aluminum screws/bolts must be replaced each time they are released. 
Aluminum screws/bolts are permitted with and without color coding (blue).
For reliable identification:
Aluminum screws/bolts are not magnetic. 
Jointing torque and angle of rotation must be observed without fail (risk of damage). 

Necessary preliminary tasks: 

Evacuate A/C system.  See 64 50 009 DRAWING OFF, EVACUATING AND FILLING A/C SYSTEM (R 134A) .

Release screws (1) for A/C lines.

Disconnect plug connection (2) on air-conditioning compressor.

Do not  remove air-conditioning compressor.

Fig 1: Identifying Screws And Plug Connection
G04754747Courtesy of BMW OF NORTH AMERICA, INC.

Release bolts (1 and 2) from power steering pump bracket.

Set power steering pump down on front axle carrier.

NOTE: Do not  disconnect hydraulic lines.

If Dynamic Drive optional equipment is fitted, release bracket.

Fig 2: Identifying Power Steering Pump Bracket Bolts
G04754748Courtesy of BMW OF NORTH AMERICA, INC.

Disconnect fuel lines (1 and 2).

Close off fuel line (1) with special tool 11 5 281  .

Close off fuel line (2) with special tool 11 5 282  .

Fig 3: Identifying Fuel Line And Special Tools
G04754749Courtesy of BMW OF NORTH AMERICA, INC.

Secure special tool 11 8 680  to lifting eye on transmission side.

Press locking pin (1) in direction of arrow until locking balls (2) are loose.

Secure special tool 11 8 680  to lifting eye. Release locking pin (1).

Installation: 

Special tool 11 8 680  is correctly installed when locking balls (2) are arrested.

Special tool 11 8 680  is firmly secured to lifting eye.

Fig 4: Identifying Locking Pin And Locking Balls
G04754750Courtesy of BMW OF NORTH AMERICA, INC.

Suspend special tool 11 0 000  from special tool 11 8 680  in eye (1).

Fig 5: Identifying Special Tool 11 8 680 And Eye
G04754751Courtesy of BMW OF NORTH AMERICA, INC.

Screw in towing hook (1).

Suspend special tool 11 0 000  from engine crane.

Suspend special tool 11 0 000  from the designated mounting eyelets (2) only.

Unscrew left and right engine mounts  .

Lift engine out with crane.

Fig 6: Identifying Towing Hook And Designated Mounting Eyelets
G04754752Courtesy of BMW OF NORTH AMERICA, INC.

Assemble engine.

Observe following in case of replacement engine  .

Check function of DME.