41 33 040 Replacing Front Left Or Right Side Wall Holder
Side wall removed.
Transfer the systematic diagram onto the respective holder version.
General information:
Follow procedures for REPAIR STAGE 2 .
The following new body parts are required:
- (1) Holder, side wall, front (variant 1)
- (2) Holder, side wall, front (variant 2)
The following consumables are required:
| Material | Quantity |
|---|---|
| Adhesive K5a | 1 |
| Blind rivets N3 | 2 |
| Cleaning agent R1 | 1 |
Removal of side wall holder (variant 1):
Release welded connections in areas (1) and remove holder (2).
Preparation of new part:
Adjust new part in conjunction with side panel in front to fit.
In area of bonding surfaces (1), set 2 4.2 mm dia. bore holes (2) for blind rivetsN3.
Remove new part and deburr holes.
Installation of side wall holder:
Clean all bonding surfaces with cleaning agent R1.
Apply adhesive to bonding surfaces.
Install new part and rivet with blind rivets.
Removal of side wall holder (variant 2):
Release welded connection in area (1) and remove holder (2).
Preparation of new part:
Fit in new part.
In area of adhesive surface (1), drill a 4.2 mm dia. bore hole (2) for blind rivet N3.
Remove new part and deburr holes.
Installation of side wall holder:
Clean all bonding surfaces with cleaning agent R1.
Apply adhesive to bonding surface.
Install new part and rivet with blind rivet.