11 65 020 Removing and installing/replacing exhaust turbocharger (N20)
Necessary preliminary tasks:
- Remove the CATALYTIC CONVERTER .
- Remove ACOUSTIC COVER .
- Remove heat shield on side member.
- Remove front right SUSPENSION CROSS-BRACE .
- Drain COOLANT .
- Remove the right coolant hose.
- REMOVE bottom clean air pipe.
- Remove RIGHT CHARGE-AIR DUCT .
- Drain ENGINE OIL .
Unlock coolant hose (1) from expansion tank and pull off.
Release screws (1) from heat shield.
Remove heat shield
Tightening torque 11 65 5AZ .
Disconnect vacuum hose (1) from vacuum line.
Disconnect plug connection (2) on blow-off valve.
Unlock retaining clip (1) with a screwdriver in direction of arrow and hold.
Pull off retaining clip (1) with suitable pliers in direction of arrow.
Pull off wastegate linkage (2) from wastegate flap.
Release screws (1).
Tightening torque: 11 65 4AZ .
Remove vacuum unit.
Unclamp engine wiring harness (1) from bracket.
Release screw (2) and remove holder (3).
Tightening torque: 11 00 2AZ .
Slacken bolt (1).
Release and remove screws (2).
Holder (3) remains on exhaust turbocharger.
Unfasten screws (2).
Release oil return pipe (3) and place to one side.
Tightening torque 11 42 6AZ .
Release screw (1).
Release screw (1).
Tightening torque 11 42 6AZ .
Remove oil return line (2).
Installation note:
Replace O-ring.
Release screw (1).
Tightening torque 11 53 10AZ .
If necessary, use appropriate tool to loosen coolant return line (3) and coolant flow line (2) at connection point.
Installation note:
Replace sealing rings.
Release screw (1).
Tightening torque: 11 42 4AZ .
Release connection of oil feed line (2), if necessary with a suitable tool.
Installation note:
Replace sealing ring.
Pull off cable plug (2) of coolant pump.
Tape off engine support at front right with suitable auxiliary materials (risk of damage.) .
Release nuts (1) to (10).
Feed out exhaust turbocharger (1) towards top front and remove.
Release screw (1).
If necessary, use appropriate tool to loosen oil feeder lines at point of connection (2).
Installation note:
Replace all sealing rings (1).
Replace sealing rings of coolant RETURN and FEED LINES .
Installation note:
Replace all graphite seals (1).
Installation note:
In order to be able to feed out the exhaust turbocharger more easily, twist holder (1) as far as possible in direction of arrow and lightly fasten with screw (2).
Tightening torque: 11 65 6AZ .
Position turbocharger on cylinder head and hold in place with two bolts.
Torque and torque sequence must be observed without fail.
Tightening torque: 11 65 1AZ .
- Join flange nuts to a torque of 8 Nm in sequence (1) to (10).
- Tighten flange nuts to a torque of 13 Nm in sequence (1) to (10).
Assemble engine.
Observe BMW Diagnostics System instruction.
Carry out BMW leak test for intake system.