Necessary preliminary work
- Remove ACOUSTIC COVER
- Disconnect NEGATIVE BATTERY TERMINAL
- Remove left CHARGE AIR COOLER
- Remove INTAKE FILTER HOUSING
- Remove EXPANSION TANK .
- Remove coolant pipe from cylinder head cover (E71 only)
- Remove coolant valve for heater feed line
- Disconnect FUEL FEED LINE
- Detach wiring harness for injectors and lay to one side
- Remove IGNITION COILS , cylinders 5-8
- Remove INJECTORS , cylinders 5-8
- Remove HIGH-PRESSURE PUMP
Release bolts in sequence (17 to 1).
Remove cylinder head cover.
Clean sealing surface (1) with special tool 11 4 470 .
Installation note: