Necessary preliminary work
- Remove LEFT CYLINDER HEAD .
- Remove RIGHT CYLINDER HEAD .
- Remove ALL VALVES .
NOTE:
Set of special tools 11 8 080
can be used for cylinder bank 1 to 4 and cylinder bank 5 to 8.
Position special tool 11 8 081 on cylinder head.
Insert special tool 11 8 083 and tighten in sequence (1 to 10) in several steps.
Tightening torque: 25 Nm
Remove vent screw (1).
Tightening torque: 11 12 8AZ .
Installation note:
Replace sealing ring.
IMPORTANT:
Max: 0.8 Nm.
Screw in special tool 11 8 082 with suitable tool and special tool 00 9 250 to 0.8 Nm.
Connect compressed air hose with pressure gauge.
Immerse cylinder head in a water bath. Inspection pressure 4.0 bar.
Check cylinder head for escaping air (cracks).
Screw in special tool 11 8 082 with suitable tool and special tool 00 9 250 to 0.8 Nm.
Connect compressed air hose with pressure gauge.
Immerse cylinder head in a water bath. Inspection pressure 4.0 bar.
Check cylinder head for escaping air (cracks).
NOTE:
If necessary, add cleaning agent to water bath.
Assemble engine.
Assemble engine.