Removing entrance cover with door post
Mark severance cuts in accordance with specified dimensions and cut.
IMPORTANT:
Cut outer panel only for following severance cuts.
Dimension a = approx. 280 mm from centrepoint of 25 mm dia. hole.
Dimension b = approx. 110 mm after cut a.
Dimension c = approx. 120 mm from edge of roof frame.
Dimension d = approx. 100 mm below cut c.
Measurement e = approx. 155 mm from centrepoint of 25 mm dia. hole.
Dimension f = approx. 80 mm before cut e.
Open welded connections in areas (1).
Dimension a = approx. 280 mm from centrepoint of 25 mm dia. hole.
Dimension b = approx. 110 mm after cut a.
Dimension c = approx. 120 mm from edge of roof frame.
Dimension d = approx. 100 mm below cut c.
Measurement e = approx. 155 mm from centrepoint of 25 mm dia. hole.
Dimension f = approx. 80 mm before cut e.
Open welded connections in areas (1).
NOTE:
Cut-out metal sections are required again for sealing.
Mark severance cuts in accordance with specified dimensions and cut.
IMPORTANT:
Cut outer plate only for the severance cuts (1).
For severance cut (2) cut all the way through B-pillar.
Measurement a = approx. 330 mm from centrepoint of 25 mm dia. hole.
Measurement b= approx. 205 mm before centrepoint of 25 mm dia. hole.
Dimension c = approx. 170 mm from edge of roof frame.
OPEN welded connections and welding spots in the areas (3).
For severance cut (2) cut all the way through B-pillar.
Measurement a = approx. 330 mm from centrepoint of 25 mm dia. hole.
Measurement b= approx. 205 mm before centrepoint of 25 mm dia. hole.
Dimension c = approx. 170 mm from edge of roof frame.
OPEN welded connections and welding spots in the areas (3).
Installation note:
Weld new parts in areas (4) as standard.
Apply repair welding spots in the area (3) of sill bottom edge at the available welding spots on new part/vehicle.
This is necessary because the adhesive between the spot flanges acts as an insulator.
View from below:
Open welded connections in areas (1).
View from inside:
IMPORTANT:
Cut outer metal plate only for following severance cut.
Mark severance cut (1) and cut.
Open welded connections in areas (2).
Open spot-welded adhesive joints in area (1)
Open bonded connection in area (2).
Remove B-pillar.
Open welded connections in areas (1).
Remove bulkheads (2).