Removal of engine support
Open welded connections in area (1).
Drill out rivet connections in areas (1) and (2).
Drill diameter max. 6.8 mm.
Mark severance cut (1) in accordance with dimension a and cut engine support.
Dimension a=140 mm
Roughly mark severance cuts (1) and cut.
Heat ADHESIVE AREAS with hot air blower and release sheet sections (1) from spring strut dome.
Open welded connections in area (1) and remove engine support section (2).
New part preparation
Mark severance cuts on new parts in accordance with severance cuts on vehicle and cut.
Prepare REINFORCEMENT PLATES at severance cuts.
Remove adhesive residue in areas (1).
Then FLAME-COAT bonding surfaces of spring strut dome.
Grind bonding surfaces on engine support blank accordingly. (Structure bonding)
Adjust new parts and reinforcement plates using alignment bracket or universal mount and secure
In areas (1) and (2), transfer bore holes Ø 6.8 mm for blind rivets to new part on engine support.