LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2012 >> 335is 2D Coupe >> Repair and Diagnosis >> Engine Performance >> Fuel Delivery >> Fuel System - Repair - E92 >> Injection Nozzle And Lines >> 13 53... Remove, install replace one injector (N55) as from engine number 14407685 (hold-down device concept at the top)

13 53... Remove, install replace one injector (N55) as from engine number 14407685 (hold-down device concept at the top)

Special tools required: 

It is of vital importance to adhere to the WARNINGS ON REMOVING THE INJECTORS !

Necessary preliminary tasks: 

NOTE: The following description applies to all injectors in cylinders 1-6.

Unlock connector (1) from injectors and detach.

Slacken nut (2).

Tightening torque: 12 90 5AZ .

Remove ground cable (3).

Fig 1: Identifying Ground Cable And Slacken Nut
G09846796Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: First, release screw (2). The, release screw (1).
Otherwise, the hold-down device may tilt.

Remove holding-down element (3).

Pull injectors upward out of cylinder head and remove.

NOTE: If several injectors are removed, ensure that each injector is reinstalled in its original location (cylinder).

Mark injectors.

Fig 2: Identifying Hold-Down Device And Screws
G09846773Courtesy of BMW OF NORTH AMERICA, INC.

Procedure in event of stuck injector 

Use special tool 13 0 320 to remove injectors that are stuck.

Lightly oil pull-out thread (1) and unscrew completely (see Fig 3) before using the special tool.

IMPORTANT: Pull-out thread (1) is a left-hand thread!
Fig 3: Identifying Oil Pull-Out Thread
G09846798Courtesy of BMW OF NORTH AMERICA, INC.

Fit special tool (1) 13 0 320 on injector slot. Join screws (2) to injector slot by a few threads. Screw in pull-out thread (4) until it is possible to screw the threaded sleeves (3) onto the injectors. Screw threaded sleeves (3) onto injectors and tighten down.

Tighten down screws (2).

Tightening torque: 13 53 13AZ .

Fig 4: Identifying Screw Threaded Sleeves Onto Injectors
G09846799Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: Set torque wrench (1) to 5 Nm  clockwise rotation. Together with special tool 13 0 320 this corresponds to a tensile force of max. 2000 N. The injector must be replaced  if the torque wrench is activated when the injector is pulled out!

Fit torque wrench (1) and special tool (2) 00 9 170 on hexagon head (3) of special tool 13 0 320 .

Turn torque wrench (1) in clockwise direction until the injector is pulled out.

Fig 5: Turning Torque Wrench Clockwise
G09846800Courtesy of BMW OF NORTH AMERICA, INC.

After removing, fit protective caps (1 and 2) to injector tip and fuel line connection.

Installation note: 

When installing a new injector:

Installation note: 

When reusing fuel injector:

Replace Teflon ring 

Before replacing the Teflon ring (1), make sure your hands and the work surface are clean and free of oil.

Avoid mechanical contact with injector tip (2).

Fig 8: Identifying Teflon Ring And Injector Tip
G04789982Courtesy of BMW OF NORTH AMERICA, INC.

Remove Teflon ring (2) with special tool (3) 13 0 191 from injector (1).

Use a fluff-free cloth only to remove combustion residues from cylindrical part of injector tip (do not use ultrasound or other tools/agents).

Do not clean injector tip.

Fig 9: Removing Teflon Ring From Injector
G09846804Courtesy of BMW OF NORTH AMERICA, INC.

Push new Teflon ring (1) onto the installation cone (2) 13 0 283 .

Fig 10: Identifying Teflon Ring & Cone
G09846805Courtesy of BMW OF NORTH AMERICA, INC.

Mount Teflon ring (1) with installation cone (2) 13 0 283 onto injector tip (3).

NOTE:
  • Do not use fingernails to slide Teflon ring on.
  • Do not use any lubricating agents.
  • The sealing ring is expanded when slid on.
Fig 11: Identifying Teflon Ring And Injector Tip
G09846806Courtesy of BMW OF NORTH AMERICA, INC.

Using special tool (1) 13 0 281 push Teflon ring into injector groove (3).

Fig 12: Pushing Teflon Ring Into Injector Groove
G09846807Courtesy of BMW OF NORTH AMERICA, INC.

To bring the widened Teflon ring to installation size, push special tool (1) 13 0 282 as far as it will go onto injector (2).

Do not use any lubricating agents.

Fig 13: Pushing Special Tool Onto Injector
G09846808Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: Pull mounting tip (1) of special tool 13 0 282 towards rear to release mounting taper (2) 13 0 281 .
Fig 14: Pulling Mounting Tip Of Special Tool
G09846809Courtesy of BMW OF NORTH AMERICA, INC.

Installing injector 

Before installing injector in engines that have been run: 

IMPORTANT: Injectors must not be twisted to 6 Nm! 
The injector must be replaced if this value is exceeded!

Clean only dirty injector bores.

Important - do not damage injector! 

IMPORTANT: Injection quantity compensation!

An injector quantity compensation must be carried out if an injector is replaced or changed on the cylinder side.

Injector quantity compensation is carried out with the aid of a so-called adjustment value.

The adjustment value is printed in three digits on the injector body.

The adjustment value must be read off before  installation!

Fig 16: Identifying Adjustment Value Printed In Three Digits On Injector Body
G09847073Courtesy of BMW OF NORTH AMERICA, INC.

Enter the adjustment value according to the installation location (cylinder) of the injector.

If injector quantity compensation is not carried out, the engine may run roughly or fail to start.

Injection quantity compensation is described at the end of these instructions.

Insert injectors in injector bores.

Fit special tool (1) 13 0 320 on injector slot. Join screws (2) to injector slot by a few threads. Screw in the pull-out thread (4) until the threaded sleeves (3) can be screwed onto the injectors. Screw threaded sleeves (3) onto injectors and tighten down.

Tighten down screws (2).

Tightening torque: 13 53 13AZ .

Fig 17: Identifying Screw Threaded Sleeves Onto Injectors
G09847074Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: Set torque wrench (1) to 2 Nm  counterclockwise rotation.

Fit torque wrench (1) and special tool (2) 00 9 170 on hexagon head (3) of special tool 13 0 320 .

Turn torque wrench (1) in counterclockwise direction until 2 Nm are reached.

Fig 18: Turning Torque Wrench Counterclockwise
G09847075Courtesy of BMW OF NORTH AMERICA, INC.

Installation note: 

Install hold-down device (1) with curvatures (black arrows) downward.

Fig 19: Installing Hold-Down Device With Curvatures
G09847076Courtesy of BMW OF NORTH AMERICA, INC.

Fit hold-down device (3) on injectors.

Tighten screws (1) and (2) only hand-tight.

Fig 20: Identifying Rubber Mount And Screw
G09847077Courtesy of BMW OF NORTH AMERICA, INC.

Install pressure lines on injectors and rail. Tighten nuts (1) and (2) manually only.

Installation note: 

Reinstall line damper (3).

Fig 21: Identifying Pressure Lines On Injectors And Nuts
G09847078Courtesy of BMW OF NORTH AMERICA, INC.

Firstly tighten screw (1).

Tightening torque: 13 53 6AZ .

Then tighten down screw (2).

Tightening torque: 13 53 6AZ .

Fig 22: Identifying Rubber Mount And Screw
G09847079Courtesy of BMW OF NORTH AMERICA, INC.

Tighten down pressure lines on injectors (1).

Tightening torque: 13 53 9AZ .

Then tighten down pressure lines (2) on the rail.

Tightening torque: 13 53 9AZ .

Installation note: 

Reinstall line damper (3).

Fig 23: Identifying Down Pressure Lines On Injectors
G09847080Courtesy of BMW OF NORTH AMERICA, INC.

Before installing injector in engines that have been run 

IMPORTANT: Injectors must not be twisted to 6 Nm! 
The injector must be replaced if this value is exceeded!
IMPORTANT: Injection quantity compensation!

An injector quantity compensation must be carried out if an injector is replaced or changed on the cylinder side.

Injector quantity compensation is carried out with the aid of a so-called adjustment value.

The adjustment value is printed in three digits on the injector body.

The adjustment value must be read off before  installation!

Fig 25: Identifying Adjustment Value Printed In Three Digits On Injector Body
G09846811Courtesy of BMW OF NORTH AMERICA, INC.

Enter the adjustment value according to the installation location (cylinder) of the injector.

If injector quantity compensation is not carried out, the engine may run roughly or fail to start.

Injection quantity compensation is described at the end of these instructions.

Insert injectors in injector bores.

Fit special tool (1) 13 0 320 on injector slot. Join screws (2) to injector slot by a few threads. Screw in the pull-out thread (4) until the threaded sleeves (3) can be screwed onto the injectors. Screw threaded sleeves (3) onto injectors and tighten down.

Tighten down screws (2).

Tightening torque: 13 53 13AZ .

Fig 26: Identifying Screw Threaded Sleeves Onto Injectors
G09846799Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: Set torque wrench (1) to 2 Nm  counterclockwise rotation.

Fit torque wrench (1) and special tool (2) 00 9 170 on hexagon head (3) of special tool 13 0 320 .

Turn torque wrench (1) in counterclockwise direction until 2 Nm are reached.

Fig 27: Turning Torque Wrench Counterclockwise
G09846813Courtesy of BMW OF NORTH AMERICA, INC.

Installation note: 

Install hold-down device (1) with curvatures (black arrows) downward.

Fig 28: Installing Hold-Down Device With Curvatures
G09846814Courtesy of BMW OF NORTH AMERICA, INC.

Fit hold-down device (3) on injectors.

Tighten screws (1) and (2) only hand-tight.

Fig 29: Identifying Hold-Down Device And Screws
G09846773Courtesy of BMW OF NORTH AMERICA, INC.

Install pressure lines on injectors and rail. Tighten nuts (1) and (2) manually only.

Installation note: 

Reinstall line damper (3).

Fig 30: Identifying Pressure Lines On Injectors And Nuts
G09846816Courtesy of BMW OF NORTH AMERICA, INC.

Firstly tighten screw (1).

Tightening torque: 13 53 6AZ .

Then tighten down screw (2).

Tightening torque: 13 53 6AZ .

Fig 31: Identifying Hold-Down Device And Screws
G09846773Courtesy of BMW OF NORTH AMERICA, INC.

Tighten down pressure lines on injectors (1).

Tightening torque: 13 53 9AZ .

Then tighten down pressure lines (2) on the rail.

Tightening torque: 13 53 9AZ .

Installation note: 

Reinstall line damper (3).

Fig 32: Identifying Pressure Lines On Injectors And Nuts
G09846816Courtesy of BMW OF NORTH AMERICA, INC.

Perform an injection quantity compensation 

The adjustment value is printed with three digits - depending on the version - on the injector body.

Clean spark plug slot.

Assemble engine.

Check fuel system for tightness.

Check function of DME.