11 65 020 Removing and installing/replacing exhaust turbocharger (N26)
Necessary preliminary tasks:
- Remove the catalytic converter . See 18 32 050 REMOVING AND INSTALLING/REPLACING CATALYTIC CONVERTER (N20) or 18 32 050 REMOVING AND INSTALLING/REPLACING CATALYTIC CONVERTER (N26) .
- Remove ACOUSTIC COVER
- Drain COOLANT .
- REMOVE bottom clean air pipe.
- Drain ENGINE OIL .
Release screws (1) and remove holder (2).
Unlock snap fastener (1) and tie charge air duct to one side.
Unlock retaining clip (1) with a screwdriver in direction of arrow and hold.
Pull off retaining clip (1) with suitable pliers in direction of arrow.
Pull off wastegate linkage (2) from wastegate flap.
Disconnect plug connections (1 and 2).
Release screws (3).
Tightening torque: 20 Nm
Remove the wastegate actuator.
Unclamp engine wiring harness (1) from bracket.
Release screw (2) and remove holder (3).
Tightening torque: 11 00 2AZ .
Unfasten screws (2).
Release oil return pipe (3) and place to one side.
Tightening torque 11 42 6AZ .
Release screw (1).
Tightening torque 11 42 6AZ .
Remove oil return line (2).
Installation note:
Replace O-ring.
Release screw (1).
Tightening torque 11 53 10AZ .
If necessary, use appropriate tool to loosen coolant return line (3) and coolant flow line (2) at connection point.
Installation note:
Replace sealing rings.
Release screw (1).
Tightening torque: 11 42 4AZ .
Release connection of oil feed line (2), if necessary with a suitable tool.
Installation note:
Replace sealing ring.
Tape off engine support at front right with suitable auxiliary materials (risk of damage!).
Release nuts (1) to (10) and feed exhaust turbocharger out toward the top (watch out for coolant line). Remove turbocharger towards bottom.
Release screw (1).
If necessary, use appropriate tool to loosen oil feeder lines at point of connection (2).
Installation note:
Replace all sealing rings (1).
Renew sealing rings of coolant RETURN and FEED LINES .
Installation note:
Replace all graphite seals (1).
Position exhaust turbocharger on cylinder head and hold in place with two bolts.
Torque and tightening sequence must be observed without fail.
Tightening torque: 11 65 1AZ .
- Join flange nuts to a torque of 8 Nm in sequence (1) to (10).
- Tighten flange nuts to a torque of 13 Nm in sequence (1) to (10).
Installation note:
If screw (1) cannot be secured, holder must be released.
Secure screws (1).
Tightening torque: 11 65 6AZ .
Assemble engine.
Observe BMW Diagnosis System instruction.
Perform BMW system test.
Carry out BMW leakage test for intake system.