24 31 011 Replacing torque converter flange shaft seal (GA6HP19Z)

WARNING: This page is about a different variant/trim than selected.

Necessary preliminary tasks 

IMPORTANT: After completion of work, check TRANSMISSION OIL LEVEL .
Use only approved AUTOMATIC TRANSMISSION - OPERATING FLUIDS .
Failure to comply with this instruction will result in serious damage to the transmission.

Secure transmission with special tool 24 0 200 on assembly stand 00 1 450.

Remove TORQUE CONVERTER .

NOTE: Read and comply with note on installation of TRANSMISSION RETAINING BRIDGE .
Fig 1: Identifying Screw Special Tool 24 0 200
G04726128Courtesy of BMW OF NORTH AMERICA, INC.

Attach special tool 24 2 353 to input shaft (1).

Fig 2: Connecting Special Tool (24 2 353) To Drive Shaft
G04726129Courtesy of BMW OF NORTH AMERICA, INC.

Screw in special tool 24 2 351 until it is firmly connected with radial shaft seal.

Screw in special tool 24 2 352 to remove radial shaft seal.

Fig 3: Removing Radial Shaft Seal Using Special Tool (24 2 351) And (24 2 352)
G04726130Courtesy of BMW OF NORTH AMERICA, INC.

Oil sealing lip on shaft seal.

Drive in radial shaft seal (1) with special tool 24 2 400 as far as it will go.

Fig 4: Installing Radial Shaft Seal Using Special Tool 24 2 400
G04726131Courtesy of BMW OF NORTH AMERICA, INC.