31 12 003 Removing and installing/replacing top right wishbone
NOTE:
Control arms with + or - marking (see Fig 1) are camber correction arms:
- Underdimension variant
+ Overdimension variant
These camber correction arms are used to correct the camber values by 30 minutes. To be used only if the tolerance values are exceeded or undershot!
An unmarked wishbone is a standard part.
- Underdimension variant
+ Overdimension variant
These camber correction arms are used to correct the camber values by 30 minutes. To be used only if the tolerance values are exceeded or undershot!
An unmarked wishbone is a standard part.
Necessary preliminary tasks:
Release screws (1).
Remove auxiliary part (2).
Installation note:
When installing, make wiring harness penetration (3) is in correct position.
The subsequent procedure is described in "REMOVE/INSTALL/REPLACE WISHBONE AT THE TOP LEFT ".