LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2011 >> Alpina B7L >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> Engine - Repair - F01/F02 >> 1165 Supercharger With Control >> 1165185 Removing and installing/renewing heat shield at bottom (N63) >> Necessary preliminary work

Necessary preliminary work

Release screws (1).

Tightening torque 11 65 3AZ .

Fig 1: Identifying Screws
G06888847Courtesy of BMW OF NORTH AMERICA, INC.

Release screws (1).

Tightening torque 11 65 3AZ .

Remove heat shield (2) towards top.

Fig 2: Identifying Screws And Heat Shield
G06888848Courtesy of BMW OF NORTH AMERICA, INC.

Release screws (1).

Tightening torque 11 65 3AZ .

IMPORTANT: Risk of interchange on replacement of the heat shield.
Other shields are installed in the N63H and S63 engines.
Fig 3: Identifying Heat Shield Screws
G06888849Courtesy of BMW OF NORTH AMERICA, INC.

Release front screws on heat shield (1).

Tightening torque 11 65 3AZ .

Remove heat shield (1) towards top.

IMPORTANT: Risk of interchange on replacement of the heat shield.
Other shields are installed in the N63H and S63 engines.
Fig 4: Identifying Front Screws On Heat Shield
G06888850Courtesy of BMW OF NORTH AMERICA, INC.

Assemble engine.