13 53 192 Removing and installing/replacing a pressure line (N54)

Special tools required: 

WARNING: Observe warning on cylinder head cover.
Clamp off NEGATIVE BATTERY TERMINAL (risk of fire due to short-circuiting on removal).
Electric fuel pump starts up automatically when door is opened!
Carry out installation work on fuel system only with coolant temperature below 40°C.
WARNING: Wear full face guard and protective gloves.
Fuel can emerge spontaneously at high velocity when the high-pressure line is released!
IMPORTANT: Adhere to conditions of absolute cleanliness when working on the high-pressure fuel system.

Introduced contaminants can cause malfunctions in the system!

Necessary preliminary tasks: 

NOTE:
  • Ignition coils must not be fouled by fuel!

    The resistance of the silicone material is reduced significantly by contact with fuel, which may cause the ignition coil to fail! Cloths/rags must therefore be used to prevent fuel from getting into the spark plug slots!

  • Before installing ignition coils, clean spark plug slots with compressed air.
  • Make sure the spark plug slot is absolutely clean.

Recycling: 

Fuel escapes when fuel lines are detached.

Catch and dispose of escaping fuel in a suitable container.

Observe country-specific waste-disposal regulations.

WARNING: Wear full face guard and protective gloves.
Fuel can emerge spontaneously at high velocity from the fuel injectors!
To reduce the fuel pressure, place rag over fuel injector and carefully tap against the fuel injector with a spanner.
There is a risk of injury if the fuel pressure is not reduced!
NOTE: The following description applies to all pressure lines.
First release rail pressure lines to reduce existing fuel pressure if necessary. Fuel must not get into the spark plug slot. Then release pressure line on injector.

Release nuts (1), gripping the injector with a wrench (2) in so doing.

Disconnect pressure line (3).

Fig 1: Disconnecting Pressure Line
G05501982Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: If several pressure lines are removed, ensure that each pressure line is reinstalled in its original location (cylinder).
Mark pressure lines.

Close off injector with protective cap (1).

Protective caps are available from BMW Parts Service.

Seal rail with a matching plug from special tool kit 32 1 270 .

Fig 2: Sealing Rail Using Matching Plug From Special Tools Set (32 1 270)
G05501983Courtesy of BMW OF NORTH AMERICA, INC.

Seal pressure line (1) with a matching plug from special tool kit 32 1 270 .

Fig 3: Sealing Pressure Line Using Matching Plug From Special Tools Kit (32 1 270)
G05501984Courtesy of BMW OF NORTH AMERICA, INC.

Installing pressure line: 

Installation of pressure rail is described separately from removal.

Same procedure for all pressure lines.

Copper seals that may be fitted (1) are no longer needed and must be removed.

If using the pressure line, apply a light coating of gear oil to the thread. New pressure lines are already coated.

Fig 4: Identifying Copper Seals
G05501985Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: Connect pressure line (1) without tension only.
To ensure distortion-free installation of the pressure line and to avoid damaging the thread, it must be possible for both nuts to be screwed on easily by hand!
If the nuts cannot be easily screwed on by hand, the injector must be turned into the installation position! 
NOTE: Description of "Turning injector into installation position" in the following two work steps.
Fig 5: Connecting Pressure Line
G05501977Courtesy of BMW OF NORTH AMERICA, INC.

Only if injector has to be turned into installation position: 

Fig 6: Turning Injector
G05501978Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: Do not under any circumstances pull injector out of bore!
If the injector is pulled out of the bore hole, the PTFE sealing ring must be replaced! Replacing PTFE sealing ring, refer to REMOVING/INSTALLING/REPLACING AN INJECTOR .

Tighten down screw for holding-down element (1).

Tightening torque 13 53 5AZ .

Fig 7: Locating Hold-Down Device Screw
G05501980Courtesy of BMW OF NORTH AMERICA, INC.

Adhere to tightening sequence:

When tightening nut (1) on injector, grip hexagon head of injector with wrench (3).

Tighten down nuts with special tool 37 1 151.

Tightening torque 13 53 8AZ .

Fig 8: Tightening Injector And Rail Nuts Using Special Tool (37 1 151)
G05501981Courtesy of BMW OF NORTH AMERICA, INC.

Assemble engine.

Check fuel system for leaks.

Check function of DME.