13 53 721 Replacing one injector, cylinders 1-4 (N63)
Special tools required:
Disconnect NEGATIVE BATTERY TERMINAL (risk of fire due to short-circuiting on dismantling).
Electric fuel pump starts up automatically when door is opened!
Carry out installation work on fuel system only with coolant temperature below 40 °C.
Disregard of these requirements may result in leaks!
Recycling:
Fuel escapes when fuel lines are detached.
Catch and dispose of escaping fuel in a suitable container.
Observe country-specific waste disposal regulations.
Introduced contaminants can cause malfunctions in the system!
- Do not allow any dirt particles or foreign bodies to get into the system.
- Remove all traces of dirt before removing lines or separate components.
- Use only fluff-free cloths.
- Seal all fuel system openings with protective caps or plugs.
- High pressure lines may be rescrewed a maximum of 10 times.
Necessary preliminary work:
- Remove ignition coils
. See 12 13 511 REPLACING IGNITION COILS (N63)
or 12 13 511 REPLACE THE IGNITION COILS (N63 B40/B44 O 1)
, cylinders 1-4
- Ignition coils must not be fouled by fuel!
The resistance of the silicone material is reduced significantly by contact with fuel, which may cause the ignition coil to fail! It is therefore essential to protect the spark plug slot against ingress of fuel with a cloth!
- Before installing ignition coils, clean spark plug slots with compressed air.
- Make sure the spark plug slot is absolutely clean.
- Ignition coils must not be fouled by fuel!
- Drain off AIR CONDITIONING SYSTEM
- Remove right intake port. Refer to 13...... REMOVING INTAKE DUCT (N63) or 13...... REMOVE THE INTAKE PORT (N63 B40/B44 O 1) .
- Remove REAR RIGHT SUSPENSION CROSS-BRACE
- Remove REAR UNDERBODY PROTECTION
In all-wheel-drive vehicles:
- Remove STIFFENING PLATE
Unlock and detach plug connections (1 and 2).
Release transmission wiring harness (3) from marked clamps.
Unfasten plug connection (1) and disconnect.
Slide transmission wiring harness as far as possible in an upward direction.
Pull gasket (1) in the operating range off in an upward direction.
Unfasten screws (2).
Release screws (3).
Tightening torque 51 71 3AZ .
Remove right bulkhead side section (4) upwards.
Release screws (1).
Tightening torque 12 90 4AZ .
Release clamp (2).
Remove lid (3) from auxiliary box.
Unclip grommet hold-down device (1).
Release wiring harness (2) from bulkhead.
Unlock connector (3) and remove.
Release screws (1).
Tightening torque 12 90 2AZ .
Remove electronics box cover (2).
Unlock all connectors (1) from control unit and disconnect.
Unclip grommet hold-down device (2) and remove.
Detach rubber grommets (3) from electronics box. Place wiring harnesses to the side.
Installation note:
Make sure grommets are correctly seated (watertightness).
Slacken nut (1).
Tightening torque 12 51 1AZ .
Detach earthing cable (2).
Release screw (1).
Lay filler neck (2) for windscreen washer fluid to one side.
Release screws (1).
Tightening torque 12 90 1AZ .
Unclip coolant lines at clamp (2) from electronics box.
Carefully feed out the electronics box (1) complete with control unit upwards and place to one side.
Installation note:
When installing the electronics box (1), insert guide (3) on engine support.
Open cover.
Release screw (1).
Tightening torque 12 42 3AZ .
Remove positive battery cable lead (2) from positive battery connection point.
Release positive battery cable (2) from clamps (3).
Release screw (1).
Tightening torque 64 53 3AZ .
Detach A/C line (2) and place to one side.
Replace sealing ring on A/C line.
Slacken nut (1).
Tightening torque 12 42 7AZ .
Remove positive battery cable (2) and place to one side.
Release clamp (1).
Tightening torque 13 71 8AZ .
Release clamp (2).
Replace clamp (2).
Remove right charge-air duct (3).
Check the gasket on the exhaust turbocharger. replacing if necessary.
Graphic shows the left side, the procedure for the right side is identical.
Detach hoses (1) from clean air pipe.
Release screw (2).
Tightening torque 13 71 1AZ .
Detach clean-air pipe (3) in direction of travel from exhaust turbocharger.
Check seal on clean air pipe and renew if necessary.
Release screw (1).
Tightening torque 12 51 2AZ .
Unlock plug connections for oxygen sensor and disconnect.
Release screws (1).
Tightening torque 12 51 2AZ .
Release wiring harness (2).
Release wiring harness (3) and place to one side.
Release screw (1).
Tightening torque 12 51 2AZ .
Raise cable duct (2).
Lay positive battery cable (1) and wiring harness for injectors (2) forwards.
Slightly raise engine wiring harness (3).
Fuel can emerge spontaneously at high velocity from the fuel injectors!
To reduce the fuel pressure, place rag over fuel injector and carefully tap against the fuel injector with a spanner.
There is a risk of injury if the fuel pressure is not reduced!
Only for injector, cylinders 5 and 6:
Remove pressure line between high pressure pump and rail .
Graphic shows the left side. Procedure on right side identical.
Release union nuts (1).
Disconnect pressure line (2).
Removing all pressure lines, cylinders 1-4 between injector and rail:
First disconnect the pressure line from the rail. To reduce existing fuel pressure if necessary. Fuel must not get into the spark plug slot. Then disconnect the pressure line from the injector.
Tighten down pressure line on rail with special tools (2) 00 1 440 , (3) 13 0 162 and (4) 13 0 161 .
Secure injector against twisting with spanner (2).
Release union nut (1).
Remove pressure line.
Mark pressure lines.
Oil and dirt particles may get into your eyes!
Before removing the injectors, clean or vacuum off injector slots.
Removing injector:
Release bolt (1) and remove holding-down element (2).
Pull out injector (1).
Mark injectors.
Procedure in event of stuck injectors:
Mount special tool 13 0 301 or 13 0 302 (from set of special tools 13 0 300 ) on the stuck injector. In so doing, attach the special tool at the bottom to the injector and secure at the top with the knurled screw to the injector feed.
Mount special tool 13 0 300 over the stuck injector with special tool 13 0 301 or 13 0 302. In so doing, insert screws (1) in the designated holes and screw down.
Tightening torque 13 53 10AZ .
Twist bolt (1) through special tool 13 0 300 into special tool 13 0 301 or 13 0 302 on the stuck injector. Tighten down bolt (1) until the injector is pulled out.
After removing, fit protective caps (1 and 3) to injector tip and fuel line connection.
Protective caps are available from BMW Parts Service.
Installation note:
When installing a new injector:
- Use a new uncoupling element (2).
- Pull protective cap (1) off of injector tip maximum 10 min. before installation (Teflon ring swells).
Installation note:
When reusing fuel injector:
- Replace decoupling element (2).
- Replace Teflon ring (1).
A Teflon ring which has been heated once by engine operation must be replaced before the injector is reinstalled.
Replace Teflon ring:
Before replacing the Teflon ring (1), make sure your hands and the work surface are clean and free of oil.
Avoid mechanical contact with injector tip (2).
Remove Teflon ring (1) with special tool 13 0 191 from injector (2).
Use a fluff-free cloth only to remove combustion residues from cylindrical part of injector tip (do not use ultrasound or other tools/agents).
Do not clean injector tip.
Push new Teflon ring (1) onto the installation cone 13 0 195 .
Push Teflon ring (1) with fingers assisted by the installation cone 13 0 195 onto the injector (2).
- Do not use fingernails to slide Teflon ring on.
- Do not use any lubricating agents.
- The sealing ring is expanded when slid on.
To bring the expanded Teflon ring to its installation dimension, slide three assembly sleeves with decreasing diameters onto the injector.
Slide assembly sleeve (1) with large opening first onto injector (1).
Do not use any lubricating agents.
First slide assembly sleeve 13 0 192 (large diameter) onto injector (1).
Then slide assembly sleeve 13 0 193 (medium diameter) onto injector (1).
Finally, press injector (1) into assembly sleeve 13 0 194 (small diameter).
Installation note:
Install injector within 10 minutes or slide on protective cap (Figure) Teflon ring swells up.
Installing injector:
Installation of injector is described separately from removal.
Before installing injector in engines that have been run:
- Check injector bore for dirt.
Clean only dirty injector bores.
Important - do not damage injector!
- Clean injector bore: To do so, preferably slide injector without decoupling element (2) but with new Teflon ring (1) in and out of injector bore several times.
The Teflon ring must subsequently be replaced.
- Clean contact surfaces of uncoupling elements (2) in cylinder head.
- Replace decoupling element (2).
An injector quantity compensation must be carried out if an injector is replaced or changed on the cylinder side.
Injector quantity compensation is carried out with the aid of a so-called adjustment value.
The adjustment value is printed in two blocks of three digits on the injector.
The adjustment value must be read off before installation!
Enter the adjustment value according to the installation location (cylinder) of the injector.
If injector quantity compensation is not carried out, the engine may run roughly or fail to start.
Description of injector quantity compensation at end of instructions.
Installation note:
Hold-down device (1) is installed with curvature facing upwards.
Install injector (1).
Mount hold-down device (2) with the curvature facing upwards.
Only for injector, cylinders 5 and 6:
Install pressure line between high pressure pump and rail .
Tighten down pressure line (1) hand-tight on rail and injector.
First tighten high-pressure line (1) on high-pressure pump using torque wrench (2) and special tool (3) 00 1 440 .
Tightening torque 13 53 3AZ .
Only for injector, cylinders 5 and 6:
Installation note:
When tightening the pressure line on the rail, ensure that the angle of rotation of special tool 13 0 140 is restricted. Reapply the special tool if necessary.
Only for injector, cylinders 5 and 6:
Tighten high-pressure line (1) on rail using torque wrench (2), long crowfoot spanner (3) and special tool (4) 13 0 140 .
Tightening torque 13 53 3AZ .
Installation of pressure line between injector and rail:
Install pressure line (2). Tighten nuts (1) manually only.
To ensure distortion-free installation of the pressure line and to avoid damaging the thread, it must be possible for both nuts to be screwed on easily by hand!
If the nuts cannot be screwed on easily by hand, the injector must if necessary be turned a little.
Turn injector (1) if necessary in direction of arrow until nuts on pressure line can be easily screwed on by hand.
Tighten nut (2) of pressure line hand-tight.
Then tighten down bolt for hold-down device (3).
Tightening torque 13 53 5AZ .
Adhere to tightening sequence:
- First tighten down pressure line on injector.
Tighten down nut on injector with special tool (1) 13 0 161 and to torque (2). In so doing, grip hexagon head of injector with wrench (3).
Tightening torque 13 53 2AZ .
For cylinder 4, tighten pressure line (1) with torque (2) and crowfoot wrench (3). In so doing, grip hexagon head of injector with spanner.
Tightening torque 13 53 2AZ .
- After this, tighten pressure line on rail.
Tighten down pressure line on rail with torque wrench (1) and special tools (2) 00 1 440 , (3) 13 0 162 and (4) 13 0 161 .
Tightening torque 13 53 2AZ .
Perform an injection quantity compensation:
- Connect BMW diagnosis system
- Identify vehicle
- Select "Function selection"
- Select "Service functions"
- Select "Engine electronics"
- Select "Adjustment function"
- Select "Adjust injectors"
- Change "Test schedule"
- For each replaced injector, the adjustment value must be entered according to the installation location (cylinder).
Assemble engine.
Bleed fuel system with BMW diagnosis system.
Check fuel system for tightness.
Check function of DME.