New Part Preparation
WARNING: This page is about a different variant/trim than selected.
Prepare REINFORCEMENT PLATES at the C-pillar cross-section.
Mark new part in accordance with severance cut on vehicle + 20 mm extra material and cut (1).
Slide the new part under the weld point flange in area (3).
Prepare areas (2) and (3) for plug welding.