LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2011 >> 335i 2D Convertible, Standard >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 39 (Collision - Body Panel Repair (E90)) >> Body Panel Repair General Information >> 41 00... Notes On Adhesive K2 >> Adhesive K2 (2x290 ml)

Adhesive K2 (2x290 ml)

WARNING: This page is about a different variant/trim than selected.
IMPORTANT: During the initial 12 hours, no accelerated hardening with a heat gun or heat chamber is permitted!

The solidity for installation work  on the vehicle is reached after:

12 hours at an object temperature of 18°C.

Vehicle strength for driving applications  is achieved after:

48 hours at an object temperature of 18°C.

IMPORTANT: When a complete side frame is replaced (without partial replacement), the hardening period will increase to 24 hours until the beginning of installation work.