Action in service
- Check wiring harness between electric fan cutoff relay and DME
- Check cutoff relay (when Terminal 15 is off then 0 V should be present at both screw connections (M6). When activated the relay should click loudly, while virtually no resistance (0 ohms) should be measured between the screw connections
- Replace cutoff relay