LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2009 >> X5 48i >> Repair and Diagnosis >> External Pages >> Different car >> Section 1650 (Steering And Wheel Alignment - Repair) >> Pump And Oil Supply >> 32 41 060 Removing and installing (replacing) power steering vane pump (N52, N53)

32 41 060 Removing and installing (replacing) power steering vane pump (N52, N53)

WARNING: This page is about a different car, the 2010 BMW 528i, 2009 BMW 528i, and 2008 BMW 528i. However, it is still accessible from the selected car via links, so may be relevant.
WARNING: Danger of poisoning  if oil is ingested/absorbed through the skin!
Risk of injury  if oil comes into contact with eyes and skin!
IMPORTANT: Adhere to the utmost cleanliness. Do not allow any dirt to enter the hydraulic system.
Close off pipe connections with plugs.
IMPORTANT: Aluminium-magnesium materials. 
No steel screws/bolts mays be used due to the threat of electrochemical corrosion.
A magnesium crankcase requires aluminum screws/bolts exclusively.
Aluminum screws/bolts must be replaced each time they are released. 
The end faces of aluminum screws/bolts are painted blue for the purposes of reliable identification.
Jointing torque and angle of rotation must be observed without fail (risk of damage). 

Recycling: 

Catch and dispose of hydraulic fluid in a suitable container.

Observe country-specific waste-disposal regulations

Necessary preliminary tasks: 

Release screws (1).

Installation: 

Replace aluminum screws. 

Observe screwing sequence.

Fig 1: Identifying Screws
G04756094Courtesy of BMW OF NORTH AMERICA, INC.

N52: 

Release hose clamp (1) and detach suction line (2) from vane pump.

Installation: 

Markings on suction line and vane pump connection must match up.

Release banjo bolt (4) and detach pressure line (3) from vane pump.

Fig 2: Identifying Hose Clamp And Suction Line With Pressure Line
G04756095Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Replace all sealing rings.

Make sure pressure line is laid without tension and with sufficient spacing to adjoining components.

Tightening torque 32 41 3AZ  . See 41 PUMP AND OIL SUPPLY .

N53: 

Release hose clamp (1) and detach suction line (2) from vane pump.

Installation: 

Markings (3) on suction line and vane pump connection must match up.

Release banjo bolt (4) and detach pressure line (5) from vane pump.

Fig 3: Identifying Hose Clamp, Banjo Bolt, Pressure Line And Suction Line
G05476703Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Replace all sealing rings.

Make sure pressure line is laid without tension and with sufficient spacing to adjoining components.

Tightening torque 32 41 3AZ  . See 41 PUMP AND OIL SUPPLY .

Release screws (1) and remove vane pump (2) towards bottom.

Installation: 

Replace aluminum screws. 

Observe screwing sequence.

Fig 4: Identifying Vane Pump And Bolts
G04756096Courtesy of BMW OF NORTH AMERICA, INC.

Screw-fastening sequence: 

  1. Secure vane pump with screws
  2. Tighten side screws to 2 Nm
  3. Tighten front screws to 2 Nm
  4. Tighten down front screws to jointing torque and angle of rotation

    Tightening torque 32 41 1AZ  . See 41 PUMP AND OIL SUPPLY .

  5. Release screws at side and check screw fastening points for gap freedom
  6. Tighten down side screws to jointing torque and angle of rotation

    Tightening torque 32 41 1AZ  . See 41 PUMP AND OIL SUPPLY .

After installation: