26 12 001 Replacing complete propeller shaft centre bearing (constant-velocity joint)
WARNING: This page does not describe the selected car, but rather 10 other vehicles, including the 2010 BMW M6, 2010 BMW 650i, 2009 BMW M6, 2009 BMW 650i, and 2008 BMW M6. However, it is still accessible from the selected car via links, so may be relevant.
Special tools required:
- 00 7 500
- 24 0 090
- 24 1 050
- 33 1 307
Remove propeller shaft.
IMPORTANT:
Propeller shaft is balanced as a unit.
Mark front propeller shaft relative to rear propeller shaft with paint stick.
Marking by means of engraving which causes surface damage (e.g. centre mark) is not permitted.
Release screw (1).
Pull propeller shaft apart.
Installation:
Thread free from grease.
When pushing shaft together, make sure that markings match up.
Insert bolt (1) with thread-locking liquid.
Tightening torque 26 11 5AZ. See PROPELLER SHAFT - TIGHTENING TORQUES .
Remove shim and dust gaiter.
Pull off centre bearing with special tool 00 7 500 / 33 1 307 and commercially available puller.
Drive new centre bearing firmly home with special tool 24 0 090 or 24 1 050.
NOTE:
Bearing inside diameter 30 mm, use special tool 24 0 090.
Bearing inside diameter 35 mm, use special tool 24 1 050.
Bearing inside diameter 35 mm, use special tool 24 1 050.