31 11 001 Replacing front axle carrier
WARNING: This page does not describe the selected car, but rather 10 other vehicles, including the 2010 BMW M6, 2010 BMW 650i, 2009 BMW M6, 2009 BMW 650i, and 2008 BMW M6. However, it is still accessible from the selected car via links, so may be relevant.
WARNING:
Danger to life!
Secure engine in installation position to prevent it from falling down.
Secure engine in installation position to prevent it from falling down.
IMPORTANT:
Adhere to the utmost cleanliness. Do not allow any dirt to enter the hydraulic system.
Seal off hydraulic lines with plugs.
Seal off hydraulic lines with plugs.
Necessary preliminary tasks:
- Disconnect battery negative lead
- Draw off and dispose off hydraulic fluid from fluid reservoir
- Secure engine in installation position
- Remove front wheels
- Remove stabilizer
- Remove pressure line and if necessary Dynamic Drive pressure line from vane pump
- Disconnect return line from power steering cooler
- Remove tension strut on both sides from front axle carrier
- Remove jointed rod of ride-height sensor from control arm
- Remove control arm on both sides from front axle carrier
- Remove tie rod end on both sides from swivel bearing
- Lower front axle carrier
Version with Dynamic Drive:
Remove pressure lines for oscillating motor of front axle with hose/pipe holders.
Remove vent hose with filter.
Remove heat shield(s).
Disconnect hydraulic lines from power steering gear and front axle carrier.
Remove left engine mount/bracket and right engine mount and if necessary remove with vacuum lines from front axle carrier.
Remove power steering gear.
Remove vehicle jack support.
Take front axle subframe down and set down on a suitable surface.
Installation:
Use previous front axle subframe as a template for modifying or replacing small parts.
After installation:
- Fill and bleed hydraulic system
- Check pipe connections for leaks
- Perform chassis alignment check
- Carry out steering angle sensor adjustment/adjustment for active front steering
- If necessary, carry out initial Dynamic Drive operation